IN.gov - Skip Navigation

Note: This message is displayed if (1) your browser is not standards-compliant or (2) you have you disabled CSS. Read our Policies for more information.

Amber Alert
Amber Alert - TEST
  • smokeAlarms
  • NTAS_widget
  • map_widget
  • state-that-works_widget

Indiana Department of Homeland Security

IDHS > About IDHS > Fire & Building Safety / Services > Fire Safety & Services > Fire & Building Code Enforcement > Industrialized Building Systems (Modular)/Mobile Structures Industrialized Building Systems (Modular)/Mobile Structures

 

The Code Enforcement division is responsible for the administration and enforcement of the Industrialized Building Systems (Modular)/Mobile Structures certification program.  For the rules that govern the administration and enforcement of the Industrialized Building System (Modular)/Mobile Structures program, can be found in The Special Administrative Rules for Industrialized Building System and Mobile Structures (675 IAC 15-1) which are adopted by the Fire Prevention and Building Safety Commission.

The certification program includes the review and release of plans for each system under which an Industrialized Building System (Modular) and Mobile Structures are to be built, as well as in-plant inspection being performed.  A system is based upon the units completed width and number of stories.  A certification label is required for each unit comprising a completed structure.

The in-plant inspections are conducted by either personnel from the Code Enforcement Division or by an authorized third party inspection company.  Each unit must be inspected at one point during construction to be eligible to receive a certification label. Each certification label has a unique serial number and is placed upon the electric service panel to identify the unit as certified for use in Indiana.  The Indiana certification label is a die cut sticker in the shape of the state in blue for mobile structures and gold for industrialized building systems (modular).

Industrialized Building System (Modular)/Mobile Structures FAQ

Q:  What is an Industrialized Building System?
A:  IC 22-12-1-14: "Industrialized building system" means any part of a building or other structure that is in whole or in substantial part fabricated in an off-site manufacturing facility for installation or assembly at the building site as part of a Class 1 structure, a Class 2 structure, or another building or structures.  However, the term does not include a mobile structure or a system that is capable of inspection at the building site.

Q:  What is a Mobile Structure?
A:  IC 22-12-1-17: (a) Mobile structure means any part of a fabricated unit that is designed to be: (1) towed on its own chassis: and (2) connected to Utilities for year-round occupancy or use as a Class 1 structure, a Class 2 structure, or another structure.

Q: What is a Modular structure?
A:  Modular structure means an industrialized building system other than a mobile structure intended to placement upon a permanent foundation. (675IAC15-1)

Q:  What is a permanent foundation?
A:  Permanent foundation means any structural system capable of transposing lads from a structure to the earth at a depth below the established frost line without exceeding the safe bearing capacity of the supporting soil.

Industrialized Building Fee Schedule

Effective May 16, 2002
Fees Required (675 IAC 15-1-22)

(a) The design release fees for manufacture shall be as follows:

   (1) System plan review:

      (A) filing fee $30
      (B) residential, add-a-room or duplex $320 (Footnote 1)
      (C) commercial $505 (Footnote 2)

   (2) System plan review (late filing):

      (A) filing fee $55
      (B) residential, add-a-room or duplex $525
      (C) commercial $552

   (3) Addenda:

      (A) filing fee $30
      (B) residential, add-a-room or duplex $85 (Footnote 1)
      (C) commercial $105 (Footnote 2)

   (4) Addenda (late filing):

      (A) filing fee $55
      (B) residential, add-a-room or duplex $140
      (C) commercial $165

Notes:
1. Includes only the original floor plan. A fifty-dollar ($50) fee is charged for each additional floor plan. Crawl space or basement plans are considered to be floor plans.
2. Includes not more than two (2) module units as a completed structure. A fifty-dollar ($50) fee is charged for each additional module unit.

   (b) The system prototype inspection fees (without a design release) shall be as follows:

      (1) First module unit $70
      (2) Second module unit $85
      (3) Third module unit and each additional module unit thereafter $105

      For the purposes of this subsection, "module unit" means a structure, or other entity, regarded as an
      elementary structural or functional constituent of a whole industrialized building system or mobile
      structure.

   (c) The third party inspection authorization fees shall be as follows:

      (1) Original application for Indiana third party inspection authorization (if the original application for
      authorization is not granted, three hundred dollars ($300) of the fee will be refunded) $830

      (2) Yearly third party inspection renewal $550

   (d) Indiana seal of acceptance fees shall be as follows:

      (1) All applications for the Indiana seal of acceptance shall be accompanied by the proper fee which
      includes in-state inspection and monitoring.
      (2) Indiana seal of acceptance $65 per seal

   (e) Fees for travel shall be as follows:

      (1) In-state or out-of-state reinspection $45 per hour
      (2) Out-of-state inspection or $45 per hour
      plus the actual expense  incurred for the purpose of inspection or monitoring
      (3) Mileage for out-of-state $0.40 per mile
      inspection/reinspection or monitoring from base station to inspection site and return
      (675 IAC 15-1-22; EFF May 16, 2002)