PAGE 1 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : September 30, 2002 CONTRACT BID LETTING RESULTS LETTING DATE : September 17, 2002 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED BOONE M -26279-C ASPHALT RESURFACE ON SR 75 MILESTONE CONTRACTORS, L.P. 89,497.00 15 W.D. FROM 0.26 MILE SOUTH OF SR 47 COLUMBUS , IN TO SR 47 (RP 036+048 TO 036+074) CASS M -25898-B ASPHALT RESURFACE ON CENTRAL PAVING, INC. 148,671.00 10 W.D. INSTITUTION ROAD AT LOGANSPORT , IN LOGANSPORT STATE HOSPITAL ON SR 25, 0.5 MILE WEST OF US 35 CASS T -26445-A NEW FLASHER INSTALLATION ON HAWK ENTERPRISES, INC. 13,334.00 10 W.D. US 24 AT US 35 CROWN POINT , IN (HUMPHREY-KOKOMO PIKE) (RP 60+73) DEKALB T -26290-B TRAFFIC SIGNAL, NEW I-69 LIGHTS & SIGNALS, INC. 44,117.00 11/23/02 NORTH BOUND RAMP AT SR 8 (RP FT. WAYNE , IN 129+006) DELAWARE R -26331-A PAVEMENT REHABILITATION AND REJECTED TO BE RE-ADVERTISED TRAFFIC SIGNAL MODERNIZATION ON COWAN RD. FROM SR 67 TO 23RD STREET DUBOIS B -26285-A BRIDGE REPLACEMENT ON US 231 ERBER & MILLIGAN CONSTR. CO. 713,806.41 100 W.D. OVER EAST FORK MILL CREEK, CHARLESTOWN , IN 2.24 km SOUTH OF SR 56 (RP 54+27) ELKHART R -26303-B ENHANCEMENT, RESTORATION OF NO BIDS RECEIVED HISTORIC RAILROAD DEPOT ELKHART COUNTY- B&O RAILROAD DEPOT ON MAIN STREET IN DOWNTOWN NAPPANEE ELKHART T -26034-A TRAFFIC SIGNAL MODERNIZATION MICHIANA CONTRACTING 43,208.00 05/16/03 LAGRANGE AND FLASHER MODERNIZATION ON PLYMOUTH , IN US 6 AT MIRIAM STREET IN NAPPANEE (RP 86+23) AND ON SR 5 AT MIDDLEBURY ROAD IN SHIPSHEWANA (RP 92+68) GIBSON RS-26307-A ASPHALT RESURFACE ON SR 168 RUDOLPH, J.H. & CO 858,253.60 60 W.D. FROM SR 65 TO US 41 (RP 0+00 EVANSVILLE , IN TO RP 7+77) PAGE 2 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : September 30, 2002 CONTRACT BID LETTING RESULTS LETTING DATE : September 17, 2002 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED LAGRANGE RT-24570-A ADDED TRAVEL LANES ON SR 9 E & B PAVING, INC. 1,998,890.92 09/30/03 FROM 0.3 MILE SOUTH OF I-80 ANDERSON , IN TO IND/MICHIGAN STATE LINE LAKE R -25318-C SIGHT DISTANCE IMPROVEMENT ON SUPERIOR CONSTRUCTION CO 3,342,868.19 08/15/03 US 41 AT 85TH ST. (RP GARY , IN 261+023) LAPORTE M -26489-A ASPHALT WEDGE AND LEVEL ON SR E & B PAVING, INC. 306,492.70 15 W.D. STARKE 8 FR 2.0 MI W OF SR 39 TO US ANDERSON , IN 35 (RP 22+07 TO RP 30+14) & ON SR 39 FR 0.7 MI S SR 8 TO SR 8 (RP 162+32 TO RP 163+02) LAWRENCE B -26363-A BRIDGE REPLACEMENT ON CR 900N HENDERSON, H.E., INC. 253,381.25 07/26/03 (HUNTERS CREEK ROAD) OVER MARTINSVILLE , IN BRANCH OF LITTLE SALT CREEK, 0.07 km EAST OF SR 446 MARION R -25820-A PAVEMENT REHABILITATION ON CALUMET ASPHALT PAVING CO. INC. 2,559,214.87 12/05/03 MERIDIAN ST FROM 86TH ST TO INDIANAPOLIS , IN 96TH ST MARION R -26486-A DEMOLITION OF HOUSES AND REJECTED TO BE RE-ADVERTISED BUILDINGS ON I-465 FROM I-70 TO 38TH STREET MARION T -26366-A TRAFFIC SIGNAL, MODERNIZATION HOOSIER COMPANY, INC. 766,011.45 06/01/03 AND CLOSED LOOP INSTALLATION INDIANAPOLIS , IN ON FRANKLIN AND MITTHOEFFER ROADS BETWEEN 10TH AND 38TH STREETS MIAMI T -25731-A NEW SIGNAL INSTALLATION AND LIGHTS & SIGNALS, INC. 131,454.65 05/16/03 WABASH SIGNAL MODERNIZATION US 24 AT FT. WAYNE , IN US 31 AND SR 13 AT LAFONTAINE ST OWEN M -26422-B ASPHALT RESURFACE ON SR 46 ROGERS GROUP, INC. 239,586.50 25 W.D. FROM WEST JUNCTION WITH SR BLOOMINGTON , IN 67/US 231 TO RAILROAD/ WHITE RIVER BRIDGE (RP 39+000 TO RP 37+142) PIKE RS-26310-A ASPHALT RESURFACE ON SR 257 RUDOLPH, J.H. & CO 938,262.73 40 W.D. FROM THE END OF SR 257 TO SR EVANSVILLE , IN 56 PAGE 3 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : September 30, 2002 CONTRACT BID LETTING RESULTS LETTING DATE : September 17, 2002 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED PORTER MT-24395-A SEWER MAINTENANCE ON I-90 AT WOODRUFF & SONS, INC. 217,770.35 11/23/02 MILE POST 23.5 MICHIGAN CITY , IN VERMILLION M -26437-B PIPE LINING INSTALLATION ON YARDBERRY LANDSCAPE 67,822.00 10 W.D. SR 63, 2.12 MILES SOUTH OF US ANDERSON , IN 36 WARREN M -26120-C GRATED BOX END SECTION B & P CONSTRUCTION 28,480.00 15 W.D. INSTALLATIONS ON SR 26 AT PENDLETON , IN 1.12 MILES WEST OF SR 55 (PINE VILLAGE) =============== TOTAL BID $ 12,761,122.62 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : September 30, 2002 CONTRACT BID LETTING RESULTS LETTING DATE : September 24, 2002 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED CLARK R -24550-A ADDED TRAVEL LANES, GOHMANN ASPHALT & CONSTR., INC. 21,755,000.00 10/31/04 INTERCHANGE MODIFICATION, CLARKSVILLE , IN BRIDGE REPL. ON I-65 FROM 1.06 MILES NORTH OF I-265 TO 1.0 MILE NORTH OF SR 60 LAPORTE M -26621-A PAVEMENT REPAIR OR LAPORTE CONSTRUCTION CO 95,994.23 11/01/02 REHABILITATION ON I-94 FROM LAPORTE , IN 1.1 MILES WEST OF US 421 TO 0.6 MILE WEST OF US 421 (RP 033+032 TO 033+052) =============== TOTAL BID $ 21,850,994.23 PAGE 4 INDIANA DEPARTMENT OF TRANSPORTATION RUN DATE : September 30, 2002 CONTRACT BID LETTING RESULTS LETTING DATE : May 21, 2002 (BY COUNTY) CONTRACTOR'S DATE TO BE COUNTY CONTRACT # DESCRIPTION - LOCATION CONTRACTOR BID COMPLETED MARION R -26186-A ROAD RECONSTRUCTION ON 38TH REJECTED TO BE RE-ADVERTISED ST FROM MARTIN LUTHER KING ST TO SALEM ST =============== TOTAL BID $ 0.00 PENDING CONTRACTS: MARCH 19, 2002: R -25976-A