INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: April 14, 2010 TIME OF LETTING: 10:00 AM EASTERN DST Sealed proposals for certain highway improvements as described below will be received from contractors holding a valid Certificate of Qualification issued by the Indiana Department of Transportation. ================================================================================================================================== LOCATION OF DEPOSIT: Indiana Department of Transportation, Mr. John P. Wooden, Bid Review & Estimate Manager, Room N855, Government Center North, 100 North Senate Avenue, Indianapolis, IN 46204-2217 LOCATION OF OPENING: All proposals will immediately thereafter be taken to the N855 Conf. Room, Government Center North, 100 N. Senate Avenue, Indianapolis, Indiana where they will be publicly opened and read. ================================================================================================================================== Contract documents will be available for downloading via the Indiana Department of Transportation (INDOT) Extranet at no cost. The internet address of the INDOT Extranet is: http://netservices.indot.in.gov/ Bids will be considered as provided for in the Prequalification and Bidding Regulations on file. Copies are available in Room N855, Government Center North. IMPLEMENTATION OF ELECTRONIC BIDDING All contracts within this notice are designated for electronic bidding via Bid Express. Only electronic bids submitted via Bid Express will be accepted on contracts designated for electronic bidding; the paper Proposal Book (blue cover) will not be issued for these contracts. It is the bidder's responsibility to check the Bid Express website for all amendment files prior to the deadline for bid submittal. This includes amendment files that may be generated as a result of administrative changes to the bidding form, which may not be communicated in a revision letter. MANDATORY BIDDER REGISTRATION Contractors desiring to submit electronic bids via Bid Express must register with INDOT as a valid bidder by submitting the form provided by INDOT Customer Service at the website below. Failure to register will cause failure of the Bid Express bid submission process. NOTICE: A bidder may request valid bidder status, by submitting the bidder registration form, until 9:00 AM eastern dst, on the bid opening date. BONDS An executed bid bond and an executed performance bond shall be included with the bid, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, the bidder may elect not to furnish a performance bond. NOTICE: Effective March 1, 2008, paper bid bonds will no longer be accepted. Only electronic bid bonds submitted through the designated electronic medium, either Surety 2000 or SurePathNetwork, will be accepted with the bid. Bid Express does not support submittal of the performance bond. The performance bond must be submitted to the construction letting email box or be delivered in paper. INTERNET ADDRESS For additional information, visit the Doing Business with INDOT - Contractors website at http://www.in.gov/dot/div/contracts/letting/index.html PAGE 1 NOTICE TO CONTRACTORS -- April 14, 2010 LETTING ___________________________________________________________________________________________________________________________________ CALL 135 CONTRACT IR-30108-A NEW ROAD CONSTRUCTION GREENFIELD DISTRICT PG. 1 RESCHEDULED FROM MARCH 3 AND FEBRUARY 10, 2010 INDOT LETTINGS PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0600339 | 0600339 NEW ROAD CONSTRUCTION HOWARD COUNTY - ON PROPOSED US 31 FROM 0.5 MILE SOUTH OF SR 26 TO 2.5 MILES SOUTH OF SR 22 (RP 902+0050 TO 905+0050) 0600568 | 0600568 NEW BRIDGE CONSTRUCTION - STR NO 31-34-8821, COMPOSITE PRESTR CONC BULB TEE BEAM, 1 SPAN, TOTAL LENGTH 108.4 LFT HOWARD COUNTY - ON PROPOSED NORTHBOUND US 31 OVER CR 300S (RP 903+0084 TO 903+0085) 0600569 | 0600569 NEW BRIDGE CONSTRUCTION - STR NO 31-34-8822, COMPOSITE PRESTR CONC BULB TEE BEAM, 1 SPAN, TOTAL LENGTH 108.4 LFT HOWARD COUNTY - ON PROPOSED SOUTHBOUND US 31 OVER CR 300S (RP 903+0084 TO 903+0085) 0600570 | 0600570 NEW BRIDGE CONSTRUCTION - STR NO 26-34-8823, COMPOSITE PRESTR CONC BULB TEE BEAM, 2 SPANS, TOTAL LENGTH 238.833 LFT HOWARD COUNTY - ON SR 26 OVER US 31, 0.3 MILE EAST OF CR 150E (RP 066+0071) 0600802 | 0600802 NEW BRIDGE CONSTRUCTION - STR NO 31-34-8868, COMPOSITE PRESTR CONC BULB TEE BEAM, 4 SPANS, TOTAL LENGTH 477.5 LFT HOWARD COUNTY - ON NORTHBOUND PROPOSED US 31 OVER KOKOMO CREEK, 0.5 MILE SOUTH OF CR 200S (RP 904+0034 TO 904+0035) 0600808 | 0600808 NEW BRIDGE CONSTRUCTION - STR NO 31-34-8869, COMPOSITE PRESTR CONC BULB TEE BEAM, 4 SPANS, TOTAL LENGTH 477.5 LFT HOWARD COUNTY - ON SOUTHBOUND PROPOSED US 31 OVER KOKOMO CREEK, 0.5 MILE SOUTH OF CR 200S (RP 904+0034 TO 904+0035) 0800636 | 0800636 NEW BRIDGE CONSTRUCTION - STR NO 31-34-9059, PRECAST RC 3-SIDED STRUCTURE, 1 SPAN, TOTAL LENGTH 28.0 LFT HOWARD COUNTY - ON PROPOSED US 31 OVER SCOTT-YOUNGMAN DITCH, 0.7 MILE NORTH OF SR 26 (RP 903+0070) 0800637 | 0800637 NEW BRIDGE CONSTRUCTION - STR NO 31-34-9060, PRECAST RC 3-SIDED STRUCTURE, 1 SPAN, TOTAL LENGTH 20.0 LFT HOWARD COUNTY - ON CR 200E OVER MARTIN-YOUNGMAN DITCH, 700 LFT SOUTH OF SR 26 (RP 903+0000) 0800638 | 0800638 NEW BRIDGE CONSTRUCTION - STR NO 31-34-9061, PRECAST RC 3-SIDED STRUCTURE, 1 SPAN, TOTAL LENGTH 20.0 LFT HOWARD COUNTY - ON NORTHBOUND ENTRANCE RAMP FROM SR 26 TO US 31 OVER MARTIN-YOUNGMAN DITCH (RP 903+0000) 0800639 | 0800639 NEW BRIDGE CONSTRUCTION - STR NO 31-34-9062, PRECAST RC 3-SIDED STRUCTURE, 1 SPAN, TOTAL LENGTH 24.0 LFT HOWARD COUNTY - ON SOUTHBOUND EXIT RAMP FROM US 31 TO SR 26 OVER MARTIN-YOUNGMAN DITCH (RP 093+0015) 0800640 | 0800640 NEW BRIDGE CONSTRUCTION - STR NO 31-34-9063, PRECAST RC 3-SIDED STRUCTURE, 1 SPAN, TOTAL LENGTH 24.0 LFT PAGE 1 NOTICE TO CONTRACTORS -- April 14, 2010 LETTING HOWARD COUNTY - ON PROPOSED US 31 OVER MARTIN-YOUNGMAN DITCH, 0.15 MILE NORTH OF SR 26 (RP 093+0015) COMPLETION DATE: June 15, 2012 DBE GOAL: 5.00 QUALIFICATIONS: C(A) D(B) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 161 CONTRACT IR-33087-A DRAINAGE DITCH CORERECTION LAPORTE DISTRICT PG. 12 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0902008 | 0902008 DRAINAGE DITCH CORRECTION LAKE COUNTY - ALONG I80/90 FROM CHASE STREET TO GRANT STREET (RP 007+0000 TO 008+0000) COMPLETION DATE: July 31, 2010 DBE GOAL: 0.00 QUALIFICATIONS: C(B) E(E) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 223 CONTRACT R -29753-A ROAD REHABILITATION GREENFIELD DISTRICT PG. 13 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0810423 | 0810423 BRIDGE DECK REPLACEMENT & WIDENING STR NO 1603F CONT COMP STEEL BEAM, 4 SPANS, TOTAL LENGTH 243 LFT MARION COUNTY - ON WEST 38TH STREET OVER GUION ROAD AND CSX RAILROAD - EASTBOUND LANES 0810424 | 0810424 BRIDGE DECK REPLACEMENT & WIDENING STR NO 1602F CONT COMP STEEL BEAM, 4 SPANS, TOTAL LENGTH 243 LFT MARION COUNTY - ON WEST 38TH STREET OVER GUION ROAD AND CSX RAILROAD - WESTBOUND LANES 9981170 | B690008 ROAD REHABILITATION MARION COUNTY - ON WEST 38TH STREET FROM I-65 TO I-465 COMPLETION DATE: October 31, 2011 DBE GOAL: 6.00 QUALIFICATIONS: B(A) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE PAGE 2 NOTICE TO CONTRACTORS -- April 14, 2010 LETTING ___________________________________________________________________________________________________________________________________ CALL 241 CONTRACT R -31484-A ROAD RECONSTRUCTION CRAWFORDSVILLE DISTRICT PG. 18 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0012760 | 3412005 ROAD REHABILITATION CLINTON COUNTY - ON SR 38 FROM SR 28 TO 1.0 MILE EAST OF SR 28 AT SOUTH FRANKFORT CORP LINE (RP 023+0024) 0012770 | 1114020 ROAD REHABILITATION CLINTON COUNTY - ON US 421 FROM NORTH JCT OF SR 28 TO 2.39 MILES NORTH OF NORTH JCT OF SR 28 (RP 123+0027 TO 125+0065) 0300290 | 0300290 SIGN MODERNIZATION CLINTON COUNTY - ON SR 38 FROM 1.0 MILE EAST OF SR 28 TO 2.39 MILES NORTH OF N JCT OF SR 28 (RP 022+0024 TO 023+0024) 0300292 | 0300292 TRAFFIC SIGNAL MODERNIZATION CLINTON COUNTY - ON SR 38 AT VARIOUS INTERSECTIONS (RP 022+0048 TO 022+0049) COMPLETION DATE: November 15, 2011 DBE GOAL: 6.00 QUALIFICATIONS: B(A) C(B) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 261 CONTRACT R -31703-A INTERSECTION IMPROVEMENT WITH ADDED TURN LANES FT. WAYNE DISTRICT PG. 22 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0300287 | 0300287 TRAFFIC SIGNALS MODERNIZATION ELKHART COUNTY - ON SR 15 AT CR 20, 1.6 MILES SOUTH OF US 20 (RP 086+0000) 9901040 | 1810016 INTERSECTION IMPROVEMENT WITH ADDED TURN LANES ELKHART COUNTY - ON SR 15 AT CR 20, 1.6 MILES SOUTH OF US 20 (RP 086+0000) COMPLETION DATE: August 06, 2010 DBE GOAL: 7.00 QUALIFICATIONS: B(A) C(B) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE PAGE 3 NOTICE TO CONTRACTORS -- April 14, 2010 LETTING ___________________________________________________________________________________________________________________________________ CALL 265 CONTRACT R -32066-A PIPE LINING VINCENNES DISTRICT PG. 24 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0900435 | 0900435 PIPE LINING PERRY COUNTY - ALONG I-64 AT VARIOUS LOCATIONS (RP 071+0084 TO 077+0091) COMPLETION DATE: August 01, 2010 DBE GOAL: 0.00 QUALIFICATIONS: 0290 THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 281 CONTRACT R -32491-A LANDSCAPING LAPORTE DISTRICT PG. 25 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0901277 | 0901277 LANDSCAPING PORTER COUNTY - ALONG NORTH CALUMET AVENUE FROM VALE PARK ROAD TO BULLSEYE LAKE ROAD IN CITY OF VALPARAISO COMPLETION DATE: November 15, 2010 DBE GOAL: 0.00 QUALIFICATIONS: E(J) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 325 CONTRACT R -33010-A DEMOLITION, REMOVE BUILDINGS, FOUNDATION FORT WAYNE DISTRICT* PG. 26 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0902190 | 0902190 DEMOLITION, REMOVE BUILDINGS, FOUNDATIONS ELKHART COUNTY - AT VARIOUS LOCATIONS ALONG SR 19 (RP 114+0023 TO 115+0093) COMPLETION DATE: May 14, 2010 DBE GOAL: 0.00 QUALIFICATIONS: C(B) E(T) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE * DISTRICT WAS CORRECTED ON 03/22/2010 PAGE 4 NOTICE TO CONTRACTORS -- April 14, 2010 LETTING ___________________________________________________________________________________________________________________________________ CALL 331 CONTRACT R -33027-A DEMOLITION, REMOVE BUILDINGS, FOUNDATIONS GREENFIELD DISTRICT PG. 27 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0902233 | 0902233 DEMOLITION, REMOVE BUILDINGS, FOUNDATIONS HOWARD COUNTY - ALONG SR 26 AT PARCELS 8, 94, 101, 120, AND 149 (RP 066+0071 TO 074+0089) COMPLETION DATE: July 31, 2010 DBE GOAL: 0.00 QUALIFICATIONS: C(B) E(T) 0163 THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 361 CONTRACT RS-29945-A ASPHALT RESURFACE FT. WAYNE DISTRICT PG. 28 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0710590 | 0710590 ASPHALT RESURFACE STEUBEN COUNTY - ON US 20, 0.43 MILE EAST OF I-69 TO 1.80 MILES EAST OF SR 127 (RP 141+0025 TO 145+0017) COMPLETION DATE: November 15, 2010 DBE GOAL: 3.00 QUALIFICATIONS: B(A) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 381 CONTRACT RS-30677-A ASPHALT RESURFACE VINCENNES DISTRICT PG. 30 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0800084 | 0800084 ASPHALT RESURFACE PIKE COUNTY - ON SR 57 0.38 MILE SOUTH OF SR 56 TO JCT WITH SR 356 (RP 035+0040 TO 036+0045) COMPLETION DATE: September 01, 2010 DBE GOAL: 2.00 QUALIFICATIONS: B(A) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PAGE 5 NOTICE TO CONTRACTORS -- April 14, 2010 LETTING ___________________________________________________________________________________________________________________________________ CALL 385 CONTRACT RS-31231-A ASPHALT RESURFACE CRAWFORDSVILLE DISTRICT PG. 32 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0501239 | 0501239 ASPHALT RESURFACE VERMILLION AND FOUNTAIN COUNTIES - ON I-74 FROM ILLINOIS STATE LINE TO 0.40 MILE EAST OF US 41 NB (RP 015+0085) COMPLETION DATE: October 08, 2010 DBE GOAL: 3.00 QUALIFICATIONS: B(A) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 391 CONTRACT RS-31485-A SMALL STRUCTURE REPLACEMENT FT. WAYNE DISTRICT PG. 33 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0101495 | 2192032 SMALL STRUCTURE REPLACEMENT NOBLE COUNTY - ON US 33, OVER WINEBRENNER DITCH, 1.95 MILES NORTH OF SR 9 (RP 055+0097 TO 055+0098) 0800743 | 0800743 ASPHALT RESURFACE NOBLE COUNTY - ON US 33 FROM SR 9 TO 0.59 MILE NORTH OF SR 109 (RP 054+0002 TO 059+0011) COMPLETION DATE: October 15, 2010 DBE GOAL: 3.00 QUALIFICATIONS: B(A) C(B) E(E) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 441 CONTRACT B -29688-A BRIDGE REPLACEMENT GREENFIELD DISTRICT PG. 36 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0301026 | 0301026 BRIDGE REPLACFEMENT - STR NO RUSH 116, COMPOSITE PRESTRESSED CONCRETE BOX BEAM, 3 SPANS, 115.5 LFT. TOTAL LENGTH RUSH COUNTY - ON CR 500N OVER LITTLE BLUE RIVER, 4 MILES NORTH OF US 52 AND 0.2 MILE WEST OF CR 400W COMPLETION DATE: October 01, 2010 DBE GOAL: 4.00 QUALIFICATIONS: D(A) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE PAGE 6 NOTICE TO CONTRACTORS -- April 14, 2010 LETTING ___________________________________________________________________________________________________________________________________ CALL 461 CONTRACT B -31232-A BRIDGE REPLACEMENT CRAWFORDSVILLE DISTRICT PG. 38 RESCHEDULED FROM MARCH 3, 2010 INDOT LETTING PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0200753 | 0200753 BRIDGE REPLACEMENT - STR NO WARREN 6, PRESTRESSED I-BEAM, 1 SPAN, TOTAL LENGTH 91.6041 LFT WARREN COUNTY - ON POSSUM RUN ROAD OVER POSSUM RUN CREEK, 1.0 MILE WEST OF SR 63 COMPLETION DATE: November 05, 2010 DBE GOAL: 6.00 QUALIFICATIONS: D(A) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 465 CONTRACT B -31727-A SCOUR PROTECTION SEYMOUR DISTRICT PG. 40 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0810068 | 0810068 SCOUR PROTECTION STR NO I-65-11-4138 REINFORCED CONCRETE ARCH, 3 SPAN, TOTAL LENGTH 186.0 lft CLARK COUNTY - ON I-65 OVER MUDDY FORK 2.38 MILES NORTH OF SR 311 (RP 011+0040) 0810071 | 0810071 SCOUR PROTECTION STR NO I-65-11-4138 REINFORCED CONCRETE ARCH, 3 SPAN, TOTAL LENGTH 186.0 lft CLARK COUNTY - ON I-65 OVER MUDDY FORK 2.38 MILES NORTH OF SR 311 (RP 011+0040) 0810079 | 0810079 SCOUR PROTECTION STR NO 58-36-62-75B PRESTRESSED CONCRETE BOX BEAM, 1 SPAN, TOTAL LENGTH 27.25 lft CLARK COUNTY - ON SR 58 OVER BRANCH OF RUNT RUN 1.7 MILES EAST OF SR 258 (RP 108+0039) 0810080 | 0810080 SCOUR PROTECTION STR NO 258-36-6405B PRESTRESSED CONCRETE BOX BEAM, 1 SPAN, TOTAL LENGTH 44.0 lft CLARK COUNTY - ON SR 258 OVER RUNT RUN 0.67 MILE EAST OF SR 58 (RP 000+0067) 0810084 | 0810084 SCOUR PROTECTION STR NO 135-36-6582B PRESTRESSED CONCRETE BOX BEAM, 1 SPAN, TOTAL LENGTH 24.0 lft CLARK COUNTY - ON SR 135 OVER KIPER CREEK 2.72 MILES NORTH OF SR 58 (RP 077+0037) COMPLETION DATE: September 17, 2010 DBE GOAL: 0.00 QUALIFICATIONS: C(B) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE PAGE 7 NOTICE TO CONTRACTORS -- April 14, 2010 LETTING ___________________________________________________________________________________________________________________________________ CALL 471 CONTRACT B -31735-A SCOUR PROTECTION FT. WAYNE DISTRICT PG. 41 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0810076 | 0810076 SCOUR PROTECTION, STR NO 22-27-04724, REINFORCED CONC GIRDER, 6 SPANS, TOTAL LENGTH 376.58 GRANT COUNTY - ON US 35, OVER MISSISSINEWA RIVER 0.09 MILES SOUTH OF SR 15 (RP 078+0064) 0810191 | 0810191 SCOUR PROTECTION, STR NO 018-27-01432, STEEL BEAM, 1 SPAN, TOTAL LENGTH 50 LFT GRANT COUNTY - ON SR 18, OVER PIPE CREEK 0.25 MILE WEST OF SR 13 (RP 094+0046) 0810192 | 0810192 SCOUR PROTECTION, STR NO 015-43-00500, CONTINUOUS REINFORCED CONCRETE SLAB, 2 SPANS, TOTAL LENGTH 52.83 LFT KOSCIUSKO COUNTY - ON SR 15, OVER WALNUT CREEK 2.24 MILES SOUTH OF SR 25 (RP 054+0055) 0810193 | 0810193 SCOUR PROTECTION STR NO 015-85-03775 REINFORCED CONCRETE ARCH, 1 SPAN, TOTAL LENGTH 25 LFT WABASH COUNTY - ON SR 15, OVER PEE DEE CREEK , 2.01 MILES NORTH OF SR 218 (RP 016+0023) 0810194 | 0810194 SCOUR PROTECTION, STR NO 124-85-1959 REINFORCED CONCRETE ARCH, 1 SPAN, TOTAL LENGTH 25 LFT WABASH COUNTY - ON SR 124, OVER ASH BRANCH 5.03 MILES WEST OF SR 13 (RP 008+0018) 0810196 | 0800196 SCOUR PROTECTION, STR NO P000-85-7063, PRESTRESSED CONC BOX BEAM, 1 SPAN, TOTAL LENGTH 29 LFT WABASH COUNTY - ON PARK ROAD OVER TEN MILE CREEK IN MISSISSINEWA RESERVOIR 0810197 | 0810197 SCOUR PROTECTION, STR NO 30-92-3730A, REINFORCED CONC ARCH, 1 SPAN, TOTAL LENGTH 25 LFT WHITLEY COUNTY - ON US 30, OVER SPRING CREEK 3.28 MILES WEST OF SR 109 (RP 107+0092) 0810198 | 0810198 SCOUR PROTECTION, STR NO 114-92-3742, REINFORCED CONCRETE ARCH, 1 SPAN, TOTAL LENGTH 25 LFT WHITLEY COUNTY - ON SR 114, OVER EAST FORK OF CLEAR CREEK 0.43 MILE WEST OF SR 9 (RP 068+0056) COMPLETION DATE: October 01, 2010 DBE GOAL: 0.00 QUALIFICATIONS: C(B) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE PAGE 8 NOTICE TO CONTRACTORS -- April 14, 2010 LETTING ___________________________________________________________________________________________________________________________________ CALL 481 CONTRACT B -31793-A SCOUR PROTECTION SEYMOUR DISTRICT PG. 42 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0810365 | 0801365 SCOUR PROTECTION - STR NO 046-15-03033 DEARBORN COUNTY - ON SR 46 OVER LOGAN CREEK, 0.94 MILE EAST OF SR 1 (RP 161+0012) 0810366 | 0810366 SCOUR PROTECTION - STR NO 052-24-03883A FRANKLIN COUNTY - ON US 52 OVER BIG CEDAR CREEK, 0.9 MILE EAST OF SR 1 (RP 161+0012) 0810367 | 0810367 SCOUR PROTECTION - STR NO 156-78-03113 SWITZERLAND COUNTY - ON SR 156 OVER PLUM CREEK, 1.72 MILES EAST OF SR 56 (RP 001+0072) 0810368 | 0810368 SCOUR PROTECTION - STR NO 252-24-06008B FRANKLIN COUNTY - ON SR 252 OVER BRANCH BIG CEDAR CREEK, 6.19 MILES EAST OF US 52 (RP 042+0079) 0810398 | 0810398 SCOUR PROTECTION - STR NO 062-39-05958B JEFFERSON COUNTY - ON SR 62 OVER MCCURRY BRANCH, 2.14 MILES EAST OF SR 250 (RP 210+0054) 0810399 | 0810399 SCOUR PROTECTION - STR NO 356-39-06434B JEFFERSON COUNTY - ON SR 356 OVER WOODS FORK CREEK, 3.0 MILES WEST OF SR 62 (RP 022+0038) COMPLETION DATE: September 24, 2010 DBE GOAL: 0.00 QUALIFICATIONS: C(B) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 491 CONTRACT B -32865-A SCOUR PROTECTION VINCENNES DISTRICT PG. 43 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0901630 | 0901630 SCOUR PROTECTION KNOX COUNTY - ON SR 358 OVER WHITE RIVER, ,1.18 MILES EAST OF SR 67 (RP 001+0018) COMPLETION DATE: November 30, 2010 DBE GOAL: 0.00 QUALIFICATIONS: C(B) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PAGE 9 NOTICE TO CONTRACTORS -- April 14, 2010 LETTING ___________________________________________________________________________________________________________________________________ CALL 501 CONTRACT B -32997-A BRIDGE MAINTENANCE AND REPAIR GREENFIELD DISTRICT PG. 44 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0901964 | 0901964 BRIDGE MAINTENANCE AND REPAIR MARION COUNTY - AT VARIOUS LOCATIONS IN MARION COUNTY WITHIN GREENFIELD DISTRICT COMPLETION DATE: August 27, 2010 DBE GOAL: 0.00 QUALIFICATIONS: C(B) E(F) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 511 CONTRACT B -33024-A BRIDGE MAINTENANCE AND REPAIR GREENFIELD DISTRICT PG. 45 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0902221 | 0902221 BRIDGE MAINTENANCE AND REPAIR - STR NO I465-125-2377, STEEL BEAM, 4 SPANS, TOTAL LENGTH 212.6666 LFT MARION COUNTY - ON EAST AND WEST BOUND I-465 OVER I-69 SOUTH BOUND TO I-465 SOUTH BOUND RAMP (RP 036+0087) COMPLETION DATE: June 30, 2010 DBE GOAL: 0.00 QUALIFICATIONS: A(B) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 551 CONTRACT M -32998-A INSTITUTION AND PARK ROAD MAINTENANCE GREENFIELD DISTRICT PG. 46 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0902168 | 0902168 INSTITUTION AND PARK ROAD MAINTENANCE VARIOUS COUNTIES - ON VARIOUS INSTITUTION AND PARK ROADS COMPLETION DATE: October 01, 2010 MBE GOAL: 0.00 WBE GOAL: 0.00 QUALIFICATIONS: B(A) E(F) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PAGE 10 NOTICE TO CONTRACTORS -- April 14, 2010 LETTING ___________________________________________________________________________________________________________________________________ CALL 561 CONTRACT M -32999-A INSTITUTION AND PARK ROAD MAINTENANCE GREENFIELD DISTRICT PG. 47 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0902169 | 0902169 INSTITUTION AND PARK ROAD MAINTENANCE VARIOUS COUNTIES - ON VARIOUS PARK ROADS WITHIN THE GREENFIELD DISTRICT COMPLETION DATE: September 30, 2010 MBE GOAL: 0.00 WBE GOAL: 0.00 QUALIFICATIONS: B(A) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 601 CONTRACT T -31622-A TRAFFIC SIGNAL MODERNIZATION FT. WAYNE DISTRICT PG. 48 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0810020 | 0810020 TRAFFIC SIGNAL MODERNIZATION VARIOUS COUNTIES - AT VARIOUS LOCATIONS THROUGHOUT THE FORT WAYNE DISTRICT COMPLETION DATE: October 02, 2010 DBE GOAL: 0.00 QUALIFICATIONS: E(A) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 603 CONTRACT T -32226-B TRAFFIC SIGNALS MODERNIZATION FT. WAYNE DISTRICT PG. 50 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0800045 | 0800045 TRAFFIC SIGNALS MODERNIZATION ELKHART COUNTY - ALONG CR 17 COMPLETION DATE: December 01, 2011 DBE GOAL: 0.00 QUALIFICATIONS: E(A) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE PAGE 11 NOTICE TO CONTRACTORS -- April 14, 2010 LETTING ___________________________________________________________________________________________________________________________________ CALL 605 CONTRACT T -32868-A ITS TRAFFIC MANAGEMENT SYSTEMS CRAWFORDSVILLE DISTRICT PG. 51 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0900419 | 0900419 ITS COMMUNICATIONS TOWERS BOONE COUNTY - ALONG I-865 AT THE ATMS COMMUNICATIONS TOWERS (RP 000+0000 TO 005+0000) 0901816 | 0901816 ITS TRAFFIC MANAGEMENT SYSTEMS BOONE COUNTY - ALONG I-65 FROM I-865 TO 0.5 MILE SOUTH OF CR 100E (RP 129+0020 TO 137+0020) COMPLETION DATE: July 31, 2011 DBE GOAL: 2.00 QUALIFICATIONS: E(A) 0048 THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 651 CONTRACT TM-31602-A LIGHTING MAINTENANCE VINCENNES DISTRICT PG. 53 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 0710600 | 0710600 BRIDGE LIGHTING MAINTENANCE KNOX COUNTY - ON SR 441 AT MEMORIAL BRIDGE OVER THE WABASH RIVER (RP 002+0061) COMPLETION DATE: August 31, 2010 MBE GOAL: 0.00 WBE GOAL: 0.00 QUALIFICATIONS: E(A) THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE PLANS ARE AVAILABLE ONLINE ___________________________________________________________________________________________________________________________________ CALL 661 CONTRACT TM-33096-A LIGHTING MAINTENANCE GREENFIELD DISTRICT PG. 54 PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION ------------------------------------------ ----------------------------------------------------------- 1000040 | 1000040 LIGHTING MAINTENANCE VARIOUS COUNTIES - AT VARIOUS LOCATIONS WITHIN THE GREENFIELD DISTRICT COMPLETION DATE: March 31, 2011 MBE GOAL: 0.00 WBE GOAL: 0.00 QUALIFICATIONS: E(A) 0165 THE CONTRACT INFORMATION BOOK IS AVAILABLE ONLINE