Sections |
Titles |
Revision/ Publication Date |
|
Introduction |
04-25-24 |
|
General Instructions |
07-17-24 |
|
Stormwater Management and Earthwork Operations |
10-03-24 |
|
Small Drainage Structures |
09-01-23 |
|
Bridges |
06-12-24 |
|
Subbase |
03-01-22 |
|
Compacted Aggregate, Pavement Recycling |
09-28-23 |
|
Portland Cement Concrete Pavement, PCCP |
03-01-24 |
|
Pavement Patching and PCCP Joint Repair |
03-01-24 |
|
Transportation or Operation of Heavy Equipment on Pavement |
03-01-22 |
|
Pavement Smoothness High Speed Inertial Profilers and The IRI Index |
12-18-23 |
|
Undersealing with Asphalt Material |
03-01-22 |
|
Hot Mix Asphalt, HMA, Pavement |
09-01-24 |
|
Utility Relocation Inspection Procedures |
03-01-22 |
|
Finishing Shoulders, Ditches, and Slopes |
03-01-22 |
|
Approaches |
03-01-22 |
|
Curbs and Gutters |
03-01-22 |
|
Original and Final Cross Sections |
03-01-22 |
|
Monuments and Government Benchmarks |
03-01-22 |
|
Sodding, Seeding, and Landscaping |
03-01-22 |
|
Guardrail, End Treatments, Impact Attenuators, and Delineators |
03-01-22 |
|
ADA Compliance for Sidewalk, Curb Ramps, Blended Transitions, and Pedestrian Facilities |
09-01-24 |
|
Paved Side Ditch, Riprap, and Geosynthetics |
03-01-22 |
|
Right-Of-Way Markers and Fence |
03-01-22 |
|
Projects with Local Public Agency Involvement |
03-01-22 |
|
Traffic Management |
12-08-23 |
|
Blank |
04-25-24 |
|
Field Documentation |
03-01-22 |
|
Shop Drawings, Falsework Plans, and MSE Wall Design |
03-22-24 |
|
Inspection Procedures for Railroad Force Account |
03-01-22 |
Contact Information
Kurt Pelz
Director, Construction Technical Services
Indiana Department of Transportation
100 N. Senate Ave., IGC N758-CM
Indianapolis, IN 46204
317-234-7726
kpelz@indot.in.gov