Language Translation
  Close Menu
INDOT: English Sections 400-500 - Effective March 1, 2005

INDOT >  Doing Business with INDOT >  Standards and Specifications >  Standard Drawings >  March 2005 >  English Sections 400-500 English Sections 400 & 500

Standard
Drawings
English
Metric
Sections
100 - 300
Sections
400, 500
Section
600
Section
700
Section
800

Effective for Lettings on or after March 1, 2005
 
Section 400 - Asphalt Pavement
Section 500 - Rigid Pavement

Last Updated: 5/27/11

Spec
Ref.
Code
Page
Title Description
Effective
Date
E400
PTRN
01
Pavement Transitions Pavement Type Transition
9/1/99
E401
REBS
01
Ramp Entrance with Bituminous Shoulder Ramp Entrance Terminal HMA Shoulder
9/1/99
E401
REBS
02
Ramp Entrance with Bituminous Shoulder Ramp Exit Terminal HMA Shoulder
1/4/99
E401
REBS
03
Ramp Entrance with Bituminous Shoulder Ramp Cross Sections HMA Shoulder
9/1/00
E401
REBS
04
Ramp Entrance with Bituminous Shoulder Ramp Terminal Tables
6/3/96
E402
SHCG
01
(Now Unassigned)  
 
E402
SHCG
02
(Now Unassigned)  
 
E402
TMPT
01
Pavement Treatment Termination Termination of Mainline Pavement Overlay
3/1/05
E500
PTRN
01
Pavement Transitions Pavement Type Transition
9/1/99
E500
PTRN
02
Pavement Transitions Pavement Type Transition
1/3/00
E500
PTRN
03
Pavement Transitions Pavement Type Transition
9/1/99
E500
PTRN
04
Pavement Transitions Pavement Type Transition
9/1/99
E500
SHCG
01
(Now Unassigned)  
 
E500
SHCG
02
(Now Unassigned)  
 
E501
CCPJ
01
(Now Unassigned)  
 
E501
CCPJ
02
(Now Unassigned)  
 
E501
CCPJ
03
(Now Unassigned)  
 
E501
CCPJ
04
(Now Unassigned)  
 
E501
CCPJ
05
(Now Unassigned)  
 
E501
CCPJ
06
(Now Unassigned)  
 
E501
CCPJ
07
(Now Unassigned)  
 
E501
CCPJ
08
(Now Unassigned)  
 
E501
CCPJ
09
(Now Unassigned)  
 
E501
CCPJ
10
(Now Unassigned)  
 
E501
CCPJ
11
(Now Unassigned)  
 
E501
RECS
01
Ramp Entrance Concrete Shoulder Ramp Entrance Terminal Concrete Shoulder
9/1/00
E501
RECS
02
Ramp Entrance Concrete Shoulder Ramp Exit Terminal Concrete Shoulder
9/1/99
E501
RECS
03
Ramp Entrance Concrete Shoulder Ramp Cross Sections Concrete Shoulders
1/4/99
E501
SHCG
01
(Now Unassigned)  
 
E501
SHCG
02
(Now Unassigned)  
 
E503
CCPJ
01
PCCP Joints Type D-1 Contraction Joint
3/1/05
E503
CCPJ
02
PCCP Joints Longitudinal Joint
9/1/99
E503
CCPJ
03
PCCP Joints Longitudinal Joint
3/1/04
E503
CCPJ
04
PCCP Joints Longitudinal Keyway Joint
9/1/99
E503
CCPJ
05
PCCP Joints Transverse Construction Joint
9/1/99
E503
CCPJ
06
PCCP Joints Transverse Joint Seals
3/1/05
E503
CCPJ
07
PCCP Joints Longitudinal Construction Joint
9/1/99
E503
CCPJ
08
PCCP Joints Longitudinal Construction Joint
9/1/99
E506
CCPP
01
PCCP Patching Concrete Pavement Patch Details
9/1/99
E507
RLTC
01
Retrofit Load Transfer of PCCP Retrofit Dowel Slot & Slot Details
9/1/04
E507
RLTC
02
Retrofit Load Transfer of PCCP Retrofit Dowel Slot & Bar Location
9/1/04

INDOT Events

More News & Events

Top FAQs