INDOT > Doing Business with INDOT > Standards & Specifications > Standard Drawings > Sept 2005 > English Sections 100-300 English Sections 100-300
Standard Drawings |
English Metric |
Sections 100 - 300 |
Sections 400, 500 |
Section 600 |
Section 700 |
Section 800 |
Effective for Lettings on or after September 1, 2005 |
Section 100 - General Provisions Section 200 - Earthwork Section 300 - Bases |
Last Updated: 6/3/11
Spec Ref. |
Code |
Page |
Title | Description | Effective Date |
E105 |
RBCL |
01 |
Road & Bridge Contract Limits | Road & Bridge Contract Limits | 9/1/00 |
E205 |
TECB |
01 |
(Now Unassigned) | ||
E205 |
TECB |
02 |
(Now Unassigned) | ||
E205 |
TECD |
01 |
Temporary Erosion Control Ditch | Temporary Check Dam, Revetment Rip Rap | 3/3/03 |
E205 |
TECD |
02 |
Temporary Erosion Control Ditch | Temporary Check Dam, Straw Bales | 3/1/05 |
E205 |
TECD |
03 |
(Now Unassigned) | ||
E205 |
TECD |
04 |
Temporary Erosion Control Ditch | Temporary Sediment Trap | 3/1/04 |
E205 |
TECD |
05 |
(Now Unassigned) | ||
E205 |
TECI |
01 |
Temporary Erosion Control Inlet | Temporary Ditch Inlet Protection, Aggregate Ring | 3/1/02 |
E205 |
TECI |
02 |
Temporary Erosion Control Inlet | Temporary Ditch Inlet Protection, Geotextile Box | 3/1/02 |
E205 |
TECI |
03 |
Temporary Erosion Control Inlet | Temporary Ditch Inlet Protection, Slotted Barrel | 3/1/02 |
E205 |
TECP |
01 |
(Now Unassigned) | ||
E205 |
TECP |
02 |
Temporary Erosion Control Perimeter | Temporary Silt Fence | 3/1/02 |
E205 |
TECP |
03 |
(Now Unassigned) | ||
E205 |
TECP |
04 |
(Now Unassigned) | ||
E205 |
TECP |
05 |
(Now Unassigned) | ||
E205 |
TECS |
01 |
Temporary Erosion Control Slope | Temporary Interceptor Ditch | 3/1/02 |
E205 |
TECS |
02 |
Temporary Erosion Control Slope | Temporary Slope Drain | 9/4/01 |
E205 |
TECS |
03 |
Temporary Erosion Control Slope | Temporary Slope Drain | 9/4/01 |
E205 |
TECS |
04 |
(Now Unassigned) | 9/4/01 |
|
E211 |
BFIL |
01 |
Bridge Fill | Part Plan for Flared Wings | 3/3/03 |
E211 |
BFIL |
02 |
Bridge Fill | Flared Wings Typical Cross Section | 9/30/94 |
E211 |
BFIL |
03 |
Bridge Fill | Backfill Placement at Interior Support | 9/2/03 |
E211 |
BFIL |
04 |
Bridge Fill | Backfill Placement at End Bent, Beam Structure | 9/2/03 |
E211 |
BFIL |
05 |
Bridge Fill | Backfill Placement at End Bent, Slab Structure | 9/1/04 |
E303 |
SHDR |
01 |
(Now Unassigned) | ||
E303 |
STRW |
01 |
Shoulder Treatment Resurfacing Work | Shoulder Treatment for Resurfacing Work | 4/3/95 |