Language Translation
  Close Menu
INDOT: English Sections 400 & 500 - Effective 09/01/2007

Indiana Department of Transportation

INDOT >  Doing Business with INDOT >  Standards & Specifications >  Standard Drawings >  Sept 2007 >  English Sections 400 & 500 English Sections 400 & 500

Standard
Drawings
English
Metric
Sections
100 - 300
Sections
400, 500
Section
600
Section
700
Section
800
Revised & New Drawings
Effective 09/01/07

Effective for Lettings on or after September 1, 2007
 
Section 400 - Asphalt Pavement
Section 500 - Rigid Pavement
 
Last Updated: 5/8/13
Ref.
Title Description
Date
E 400-PTRN-01 Pavement Transitions Pavement Type Transition
9/1/99
E 401-REBS-01 Ramp Entrance with Bituminous Shoulder Ramp Entrance Terminal HMA Shoulder
9/1/99
E 401-REBS-02 Ramp Entrance with Bituminous Shoulder Ramp Exit Terminal HMA Shoulder
1/4/99
E 401-REBS-03 Ramp Entrance with Bituminous Shoulder Ramp Cross Sections HMA Shoulder
9/1/00
E 401-REBS-04 Ramp Entrance with Bituminous Shoulder Ramp Terminal Tables
6/3/96
E 500-PTRN-01 Pavement Transitions Pavement Type Transition
9/1/99
E 500-PTRN-02 Pavement Transitions Pavement Type Transition
1/3/00
E 500-PTRN-03 Pavement Transitions Pavement Type Transition
9/1/99
E 500-PTRN-04 Pavement Transitions Pavement Type Transition
9/1/99
E 501-RECS-01 Ramp Entrance Concrete Shoulder Ramp Entrance Terminal Concrete Shoulder
9/1/00
E 501-RECS-02 Ramp Entrance Concrete Shoulder Ramp Exit Terminal Concrete Shoulder
9/1/99
E 501-RECS-03 Ramp Entrance Concrete Shoulder Ramp Cross Sections Concrete Shoulders
1/4/99
E 503-CCPJ-01 PCCP Joints Type D-1 Contraction Joint
9/4/07
E 503-CCPJ-02 PCCP Joints Longitudinal Joint
9/1/99
E 503-CCPJ-03 PCCP Joints Longitudinal Joint
3/1/04
E 503-CCPJ-04 PCCP Joints Longitudinal Keyway Joint
9/1/99
E 503-CCPJ-05 PCCP Joints Transverse Construction Joint
9/1/99
E 503-CCPJ-06 PCCP Joints Transverse Joint Seals
3/1/05
E 503-CCPJ-07 PCCP Joints Longitudinal Construction Joint
9/1/99
E 503-CCPJ-08 PCCP Joints Longitudinal Construction Joint
9/1/99
E 506-CCPP-01 PCCP Patching Concrete Pavement Patch Details
3/1/06
E 507-RLTC-01 Retrofit Load Transfer of PCCP Retrofit Dowel Slot & Slot Details
9/1/04
E 507-RLTC-02 Retrofit Load Transfer of PCCP Retrofit Dowel Slot & Bar Location