Indiana Department of Transportation
INDOT > Doing Business with INDOT > Standards & Specifications > Standard Drawings > Sept 2008 > English Sections 400 & 500 English Sections 400 & 500
Standard Drawings |
English Metric |
Sections 100 - 300 |
Sections 400, 500 |
Section 600 |
Section 700 |
Section 800 |
Revised & New Drawings Effective 09/01/08 |
Effective for Lettings on or after September 1, 2008 |
Section 400 - Asphalt Pavement Section 500 - Rigid Pavement |
Last Updated: 5/8/13
Ref. |
Title | Description | Date |
E 400-PTRN-01 | Pavement Type Transition | Pavement Transitions | 9/1/99 |
E 401-REBS-01 | Ramp Entrance Terminal HMA Shoulder | Ramp Entrance with Bituminous Shoulder | 9/2/08 |
E 401-REBS-02 | Ramp Exit Terminal HMA Shoulder | Ramp Entrance with Bituminous Shoulder | 1/4/99 |
E 401-REBS-03 | Ramp Cross Sections HMA Shoulder | Ramp Entrance with Bituminous Shoulder | 9/1/00 |
E 401-REBS-04 | Ramp Terminal Tables | Ramp Entrance with Bituminous Shoulder | 6/3/96 |
E 500-PTRN-01 | Pavement Type Transition | Pavement Transitions | 9/1/99 |
E 500-PTRN-02 | Pavement Type Transition | Pavement Transitions | 1/3/00 |
E 500-PTRN-03 | Pavement Type Transition | Pavement Transitions | 9/1/99 |
E 500-PTRN-04 | Pavement Type Transition | Pavement Transitions | 9/1/99 |
E 501-RECS-01 | Ramp Entrance Terminal Concrete Shoulder | Ramp Entrance Concrete Shoulder | 9/2/08 |
E 501-RECS-02 | Ramp Exit Terminal Concrete Shoulder | Ramp Entrance Concrete Shoulder | 9/2/08 |
E 501-RECS-03 | Ramp Cross Sections Concrete Shoulders | Ramp Entrance Concrete Shoulder | 1/4/99 |
E 503-CCPJ-01 | Type D-1 Contraction Joint | PCCP Joints | 9/4/07 |
E 503-CCPJ-02 | Longitudinal Joint | PCCP Joints | 9/1/99 |
E 503-CCPJ-03 | Longitudinal Joint | PCCP Joints | 3/1/04 |
E 503-CCPJ-04 | Longitudinal Keyway Joint | PCCP Joints | 9/1/99 |
E 503-CCPJ-05 | Transverse Construction Joint | PCCP Joints | 9/1/99 |
E 503-CCPJ-06 | Transverse Joint Seals | PCCP Joints | 3/1/05 |
E 503-CCPJ-07 | Longitudinal Construction Joint | PCCP Joints | 9/1/99 |
E 503-CCPJ-08 | Longitudinal Construction Joint | PCCP Joints | 9/2/08 |
E 506-CCPP-01 | Concrete Pavement Patch Details | PCCP Patching | 3/1/06 |
E 507-RLTC-01 | Retrofit Dowel Slot & Bar Details | Retrofit Load Transfer of PCCP | 9/1/04 |
E 507-RLTC-02 | Retrofit Dowel Slot & Bar Location | Retrofit Load Transfer of PCCP | 9/1/04 |