STATE
OF INDIANA |
) |
|
BEFORE
THE INDIANA DEPARTMENT |
||
|
|||||
COMMISSIONER
OF THE DEPARTMENT Complainant, v. W. R. Grace & Co.-conn. d.b.a. Grace davison, Respondent. |
) |
|
|||
AGREED ORDER
Complainant and
Respondent desire to settle and compromise this action without hearing or
adjudication of any issue of fact or law, and consent to the entry of the
following Findings of Fact and Order. Pursuant to Indiana Code (IC) 13-30-3-3,
entry into the terms of this Agreed Order does not constitute an admission of
any violation contained herein. Respondent's entry into this Agreed Order shall
not constitute a waiver of any defense, legal or
equitable, which Respondent may have in any future administrative or judicial
proceeding, except a proceeding to enforce this order.
I. FINDINGS OF FACT
1.
Complainant
is the Commissioner (Complainant) of the Indiana Department of Environmental
Management (IDEM), a department of the State of Indiana created by IC
13-13-1-1.
2.
W.R.
Grace & Co. Conn. d.b.a Grace Davison
(Respondent), owns/operates the facility, located at 5215 Kennedy Avenue, East
Chicago, Lake County, Indiana (the Site).
3.
Respondent
is authorized by its National Pollutant Discharge Elimination System (NPDES)
Permit No. IN0000329 (the Permit), to discharge wastewater treated in
accordance with the terms and conditions of the NPDES Permit from its
Wastewater Treatment Plant (WWTP) into the Grand Calumet River from Outfall
003.
4.
IDEM
has jurisdiction over the parties and the subject matter of this action
pursuant to IC 13-30-3.
5.
Respondent
waives the issuance of a Notice of Violation and the settlement period of sixty
(60) days as provided for by IC 13-30-3-3.
6.
327
Indiana Administrative Code (IAC) 5-2-8(1) states the permittee shall comply
with all terms and conditions of the Permit.
7.
Pursuant to Part I.A.1 of
the Permit, the permittee is required to comply with the monitoring
requirements contained in the Permit, including effluent limitations.
8.
The Respondent applied for, and received, a variance from
the water quality criterion used to establish the mercury WQBEL under 327 IAC
5-3.5. As such, the Permit contains an
interim discharge limit for mercury at Outfall 003 that was developed in
accordance with 327 IAC 5-3.5-8.
9.
The current Permit’s interim effluent limitation for mercury at Outfall 003 is 7.8
ng/L, calculated as a rolling annual average.
This limit was based on Outfall 003 monitoring data from the period of
June 2014 through April 2016. In keeping
with the requirements of the variance, Respondent implemented a pollutant
minimization program plan (PMPP).
10.
When
submitting its permit renewal application in 2016, the Respondent requested to
retain the previous interim limit of 19.6 ng/L mercury because, among other
reasons, past performance of pollutant minimization activities indicated that
lower limits were not reliably or consistently achievable, and the dataset used did not capture the
full variability of effluent mercury concentrations.
11.
To date,
Respondent has not been able to achieve the 7.8 ng/L interim annual average mercury effluent limitation
during the term of the Permit. Discharge Monitoring Reports (DMRs) and Monthly Reports of
Operation (MROs) submitted by Respondent between December 2016 and December
2018 revealed exceedances of effluent limitations contained in Part I.A.1 of
the Permit as follows:
The interim annual average concentration limitation for
mercury was exceeded during December 2016, February, April, June, August,
October, and December 2017, February, April, June, August, October, and
December 2018.
During the above months, Respondent’s effluent did not comply with the interim
mercury effluent limitations for Outfall 003 contained in the Permit, in
violation of Part I.A.1 of the Permit.
12.
On July 6, 2017 and April 9, 2018, IDEM sent a
Noncompliance Letter and an Inspection Summary Letter, respectively, to
Respondent outlining effluent limit violations at Outfall 003. The letters
required a response detailing actions taken to correct the violations. On
August 2, 2017 and April 23, 2018, IDEM received responses to the letters
explaining compliance actions Respondent took and would take in furtherance of
compliance.
13.
From 2010 through present, Respondent has conducted
assessments to identify the potential source(s) of mercury in its discharge
from Outfall 003. It has determined that
the mercury derives from impurities present in sulfuric acid used at the
facility, and does not appear to be from equipment or other process materials
at the facility. Substantial efforts have not been able to consistently address
this issue through the supply chain.
Therefore, the periodic mercury exceedances noted above could continue
at Outfall 003 from the WWTP.
14.
In
recognition of the settlement reached, Respondent waives any right to
administrative and judicial review of this Agreed Order.
II. ORDER
1.
This
Agreed Order shall be effective (Effective Date) when it is adopted by
Complainant or Complainant’s delegate (as evidenced by signature), and the
adopted Agreed Order has been received by Respondent. This Agreed Order shall
have no force or effect until the Effective Date. In
addition to addressing the violations cited in Paragraph 11 of the Findings of
Fact above, this Agreed Order also addresses any additional violations of
these same rules that may have occurred prior to the Effective Date.
2.
Within 30 days of the
Effective Date, Respondent shall develop and submit to IDEM for approval a
Compliance Plan (CP) which identifies actions and additional efforts that
Respondent will take to achieve and maintain compliance with its Permit,
specifically including the actions Respondent will take to achieve and maintain
compliance with effluent limitations contained in the Permit, specifically
mercury.
The
CP shall include an implementation and completion schedule, including specific
milestone dates.
3.
After completion of the work required pursuant to the
approved CP, Respondent will operate its plant for 12 consecutive months,
obtaining mercury data at least bimonthly (every other month), in even numbered
months as required by the Permit.
Respondent will then assess the data from this (12) twelve-month period
to determine if the 12-month rolling average mercury level during this post-CP
period achieves the Permit limit. The Respondent will then conduct a Compliance
Demonstration for an additional twelve (12) month period (the Compliance
Demonstration Period), with the 12-month rolling average mercury levels being
re-calculated and reported bimonthly for the even numbered months as required
by the Permit. If the Respondent
performs mercury monitoring in months other than those required by the Permit,
calculation and reporting of the 12-month rolling average will still be performed on a bimonthly basis.
4.
At the
end of the Compliance Demonstration Period, if an exceedance of the mercury
limit (measured as a rolling 12-month average) has occurred during the
Compliance Demonstration Period, within 90 days of the end of the Compliance
Demonstration Period, Respondent shall develop and submit to IDEM, for
approval, an Additional Action Plan (AAP) which identifies the additional
actions that Respondent will take to achieve and maintain compliance with the
terms and conditions of the Permit. The AAP, if required, shall include an
implementation and completion schedule, including specific milestone dates.
5.
The plans required by Order Paragraphs 2 and 4 are subject to IDEM
approval. In the event IDEM determines that any plan submitted by Respondent is
deficient or otherwise unacceptable, Respondent shall revise and resubmit the
plan to IDEM in accordance with IDEM's notice, and the Parties will make a good
faith effort to resolve any disputes regarding the content of such notice.
After three submissions of such plan by Respondent, IDEM may seek civil
enforcement of this Order, and Respondent reserves its rights with respect to
such enforcement.
6.
Respondent,
upon receipt of written notification from IDEM of a plan’s approval, shall
immediately implement the approved plan(s) and adhere to the milestone dates
therein. If, while implementing the Compliance Plan, Respondent determines that
such milestone dates require adjustment, it may update the implementation and
completion schedule of the Compliance Plan by submitting to IDEM for approval
an Additional Action Plan with revised dates.
The approved CP and AAP shall be incorporated into the Agreed Order and
shall be deemed an enforceable part thereof.
7.
Following completion of the actions included in the AAP,
the 12 month Compliance Demonstration Period, as specified in Paragraph 3
above, will re-start. Failure to achieve compliance with the then-applicable
permit effluent limit for mercury at the conclusion of work under an Additional
Action Plan may subject Respondent to additional enforcement action.
8.
Beginning with the first calendar quarter
following the Effective Date, Respondent shall submit to IDEM a written
progress report within 10 days of the end of each calendar quarter which identifies
the compliance actions implemented during each quarter ending March 31st,
June 30th, September 30th, and December 31st
until completion of the CP or AAP.
9.
Beginning on the Effective Date and continuing
until the successful completion of the approved CP, Respondent shall, at all
times, operate its existing wastewater treatment plant as efficiently and
effectively as possible.
10.
Concurrent
with the implementation of the above plans and any related monitoring and
assessment and consistent with this Agreed Order, Respondent may pursue Permit
modification or other relief to the extent allowed by law.
11.
All
submittals required by this Agreed Order, unless Respondent is notified
otherwise in writing by IDEM, shall be sent to:
Patrick Colcord, Enforcement Case
Manager |
Office of Water Quality – IGCN 1255 |
Indiana Department of Environmental
Management |
100 North Senate Avenue |
Indianapolis, IN 46204-2251 |
12.
Respondent
is assessed and agrees to pay a civil penalty of Eleven Thousand Two Hundred
Fifty Dollars ($11,250). Said penalty amount shall be due and payable to the
“Environmental Management Special Fund” within 30 days of the Effective Date,
the 30th day being a “Due Date.”
13.
In
the event the terms and conditions of the following paragraphs are violated, IDEM
may assess and Respondent shall pay the corresponding stipulated penalty:
Order Paragraph |
Violation |
Stipulated Penalty |
||
2 |
Failure to submit the CP within the
required time period. |
$250 per week late, or part
thereof. |
||
3 |
For exceedances of the interim mercury
effluent limitation during the Compliance Demonstration Period (as calculated
by rolling averages on a bi-monthly basis). |
$400 per violation. (Each bi-monthly
assessment that exceeds the effluent limitation is one violation.A) |
||
4 |
Failure to submit the AAP, if
required, within the given time period. |
$500 per week late, or part thereof. |
||
5 |
Failure to modify the CP and/or AAP,
if required, within the given time period. |
$500 per week late, or part thereof. |
||
6 |
Failure to meet and/or implement any
milestone date set forth in the approved CP or AAP. |
$500 per week late, or part thereof. |
||
8 |
Failure to submit to IDEM a written
report of progress within 10 days of each calendar quarter. |
$150 per week late, or part thereof. |
||
9 |
Failure to at all times maintain in
good working order and efficiently operate its existing wastewater treatment
plant. |
$200 per violation. |
||
|
Note: A Both the 12-month rolling average and daily maximum for mercury
are reported in even-numbered month Discharge Monitoring Reports. However, compliance is only assessed using
the reported 12-month rolling average value.
If the Respondent performs mercury monitoring in months other than
those required by the Permit, calculation, reporting, and assessment of compliance with the
12-month rolling average will be still be performed on a bimonthly basis. |
|
||
14.
Stipulated penalties shall be due and
payable no later than the 60th day after Respondent receives written
notice that IDEM has determined a stipulated penalty is due, the 60th day
being a "Due Date." IDEM may notify Respondent per statute of
limitations that a stipulated penalty is due. Failure to notify Respondent in
writing within this time of a stipulated penalty assessment shall not waive
IDEM's right to collect such stipulated penalty or preclude IDEM from seeking
additional relief against Respondent for violation of this Agreed Order. Such additional relief includes any remedies or
sanctions available pursuant to Indiana law, including, but not limited to,
civil penalties pursuant to IC 13-30-4.
15.
Civil
and stipulated penalties are payable by check to the “Environmental Management
Special Fund.” Checks shall include the Case Number 2019-25984-W of this action
and shall be mailed to:
Indiana
Department of Environmental Management |
Accounts Receivable |
IGCN, Room
1340 |
100 North
Senate Avenue |
Indianapolis,
IN 46204 |
16.
This
Agreed Order shall apply to and be binding upon Respondent, its successors and assigns. Respondent’s
signatories to this Agreed Order certify that they are fully authorized to execute
this Agreed Order and legally bind the party they represent. No change in
ownership, corporate, or partnership status of Respondent shall in any way
alter its status or responsibilities under this Agreed Order.
17.
In
the event that the monies due to IDEM pursuant to this Agreed Order are not
paid on or before their Due Date, Respondent shall pay interest on the unpaid
balance and any accrued interest at the rate established by IC 24-4.6-1. The
interest shall be computed as having accrued from the Due Date until the date
that Respondent pays any unpaid balance. The interest shall continue to accrue
on the first of each month until the civil penalty and any interest accrued are
paid in full. Such interest shall be payable to the “Environmental Management Special
Fund,” and shall be payable to IDEM in the manner specified above.
18.
In
the event that any terms of this Agreed Order are found to be invalid, the
remaining terms shall remain in full force and effect and shall be construed
and enforced as if this Agreed Order did not contain the invalid terms.
19.
Respondent
shall provide a copy of this Agreed Order, if in force, to any subsequent
owners or successors before ownership rights are transferred. Respondent shall
ensure that all contractors, firms and other persons performing work under this
Agreed Order comply with the terms of this Agreed Order.
20.
This
Agreed Order is not and shall not be interpreted to be a permit or a
modification of an existing permit. This Agreed Order, and IDEM’s review or
approval of any submittal made by Respondent pursuant to this Agreed Order,
shall not in any way relieve Respondent of its obligation to comply with the
requirements of its applicable permits or any applicable Federal or State law
or regulation.
21.
Complainant
does not, by his approval of this Agreed Order, warrant or aver in any manner
that Respondent’s compliance with any aspect of this Agreed Order will result
in compliance with the provisions of any permit, order, or any applicable
Federal or State law or regulation. Additionally, IDEM or anyone acting on its
behalf shall not be held liable for any costs or penalties Respondent may incur
as a result of Respondent’s efforts to comply with this Agreed Order.
22.
Nothing
in this Agreed Order shall prevent or limit IDEM’s rights to obtain penalties
or injunctive relief under any applicable Federal or State law or regulation,
except that IDEM may not, and hereby waives its right to, seek additional civil
penalties for the same violations specified in the Notice of Violation.
23.
Nothing
in this Agreed Order shall prevent IDEM (or anyone acting on its behalf) from
communicating with the United States Environmental Protection Agency (US EPA)
or any other agency or entity about any matters relating to this enforcement
action. IDEM or anyone acting on its behalf shall not be held liable for any
costs or penalties Respondent may incur as a result of such communications with
the US EPA or any other agency or entity.
24.
This
Agreed Order shall remain in effect until Respondent has complied with the
terms and conditions of this Agreed Order and IDEM issues a Resolution of Case
(close out) letter to Respondent.
REMAINDER OF PAGE INTENTIONALLY LEFT
BLANK.
TECHNICAL
RECOMMENDATION: |
RESPONDENT: |
Department
of Environmental Management |
W. R. Grace & Co.-Conn., dba Grace
Davison |
|
|
By:__________________________ |
By:________________________ |
Samantha K.
Groce, Chief |
|
Water
Enforcement Section |
|
Surface Water, Operations & |
Printed:_____________________ |
Enforcement Branch |
|
Office of Water Quality |
Title:_______________________ |
|
|
Date:________________________ |
Date:_______________________ |
|
|
|
COUNSEL
FOR RESPONDENT: |
|
|
|
By:________________________ |
|
|
|
Date:______________________ |
|
|
APPROVED
AND ADOPTED BY THE INDIANA DEPARTMENT OF ENVIRONMENTAL |
|
MANAGEMENT
THIS ___________ DAY OF ________________, 20___. |
|
|
|
|
For
The Commissioner: |
|
|
|
Signed on January 22, 2020 |
|
Martha
Clark Mettler |
|
Assistant
Commissioner |
|
Office
of Water Quality |