AGREED ORDER
Complainant and Respondent desire to
settle and compromise this action without hearing or adjudication of any issue
of fact or law, and consent to the entry of the following Findings of Fact and
Order. Pursuant to Indiana Code (“IC”) 13-30-3-3, entry into the terms of this
Agreed Order does not constitute an admission of any violation contained
herein. Respondent’s entry into this Agreed Order shall not constitute a waiver
of any defense, legal or equitable, which Respondent may have in any future
administrative or judicial proceeding, except a proceeding to enforce this
order.
I. FINDINGS OF
FACT
1.
Complainant
is the Commissioner (“Complainant”) of the Indiana Department of Environmental
Management (“IDEM”), a department of the State of Indiana created by IC
13-13-1-1.
2.
Respondent
is Koetter Woodworking, Inc. (“Respondent”), which owns
and operates the stationary saw and millwork facility and a wood molding
production plant with Plant ID No. 019-00079, located at 533 Louis Smith Road, in
Borden, Clark County, Indiana (“Site”).
3.
IDEM has jurisdiction over the parties and the
subject matter of this action.
4.
Pursuant to IC 13-30-3-3, IDEM issued a Notice
of Violation (“NOV”) via Certified Mail to:
Koetter
Woodworking, Inc. Attn: Gerald T. Koetter,
President Borden, IN 47106 JerryK@koetterwoodworking.com |
Randall F. Koetter,
Registered Agent Koetter
Woodworking, Inc. 533 Louis Smith Road Borden, IN 47106 RandyK@koetterwoodworking.com |
5.
During
an investigation including an inspection on September 10, 2019 conducted by a
representative of IDEM, the following violations were found:
a.
Pursuant to Part 70 Operating Permit No.
019-38218-00079 (“Permit 38218”) Conditions D.1.6(a) and D.1.7(b) and
corresponding conditions in subsequent permits, Respondent shall perform and
maintain records of daily dry filter inspections associated with the paint
booth and perform and maintain records of weekly observations of overspray from
the paint booth stack.
From May 15,
2018 through September 30, 2018 and July 1, 2019 through September 10, 2019,
Respondent failed to perform and maintain records of daily dry filter
inspections associated with the paint booth and weekly observations of
overspray from the paint booth stack, in violation of Permit 38218 Conditions
D.1.6(a) and D.1.7(b) and corresponding conditions in subsequent permits.
b.
Pursuant to Permit 38218 Conditions D.1.6(b)
and D.1.7(b) and corresponding conditions in subsequent permits, Respondent
shall perform and maintain records of the monthly inspections of the coating
emissions from the stack and the presence of overspray on the rooftops and the
nearby ground.
From May 15,
2018 through September 10, 2019, Respondent failed to perform and maintain
records of the monthly inspections of the coating emissions from the stack and
the presence of overspray on the rooftops and the nearby ground, in violation
of Permit 38218 Conditions D.1.6(b) and D.1.7(b) and corresponding conditions
in subsequent permits.
c.
Pursuant to Part 70 Operating Permit No.
019-40135-00079 (“Permit 40135”) Conditions D.2.5 and D.2.7, Respondent shall
perform and maintain records of visible emission notations for boiler EU-01C
stack exhausts once per day.
From October
1, 2018 through October 30, 2018, Respondent failed to perform and maintain
records of visible emission notations for boiler EU-01C stack exhausts once per
day, in violation of Permit 40135 Conditions D.2.5 and D.2.7.
d.
Pursuant to Permit 38218 Condition D.4.5(b) and
corresponding conditions in subsequent permits, Respondent shall calibrate or
replace at least once every six (6) months the instruments used to determine
pressure drops across baghouses used in conjunction with the grinding and
machining operations.
From May 15,
2018 through September 10, 2019, Respondent failed to calibrate or replace at
least once every six (6) months the instruments used for determining pressure
drops across baghouses used in conjunction with the grinding and machining
operations, in violation of Permit 38218 Condition D.4.5(b) and corresponding
conditions in subsequent permits.
e.
Pursuant to Part 70 Operating Permit No.
019-41466-00079 (“Permit 41466”) Condition D.4.5(a) and the corresponding
condition in the subsequent permit, Respondent shall complete the pressure drop
readings across the baghouses used in conjunction with the grinding and
machining operation at least once per week and take reasonable response steps
if the pressure drops are outside the normal range.
From August
14, 2019 through September 10, 2019, Respondent failed to complete the pressure
drop readings across dust bin collector DC12 at least once per week and failed
to take reasonable response steps if the pressure drop was outside the normal
range, in violation of Permit 41466 Condition D.4.5(a) and the corresponding
condition in the subsequent permit.
f.
Pursuant to Permit 41466 Condition D.4.7(b) and
the corresponding condition in the subsequent permit, Respondent shall maintain
weekly records of the pressure drop readings for baghouses used in conjunction
with the grinding and machining operation.
From August
14, 2019 through September 10, 2019, Respondent failed to maintain weekly
records of the pressure drop readings for baghouses used in conjunction with
the grinding and machining operation, in violation of Permit 41466 Condition
D.4.7(b) and the corresponding condition in the subsequent permit.
6.
Respondent
has trained staff on recordkeeping since the inspection on September 10, 2019.
In addition, Respondent developed standard operating procedures for the paint
booth, the boiler, and the pressure drop readings and installed a magnehelic
gauge on dust bin collector DC-12. A preventative maintenance item was
generated to perform the calibrations of the magnehelic gauges every 6 months.
7.
Orders
of the Commissioner are subject to administrative review by the Office of
Environmental Adjudication under IC 4-21.5; however, in recognition of the settlement
reached, Respondent acknowledges notice
of this right and waives any right to administrative and judicial review of
this Agreed Order.
II. ORDER
1.
This Agreed Order shall be effective
(“Effective Date”) when it is approved by Complainant or Complainant’s delegate, and has been received by Respondent. This Agreed
Order shall have no force or effect until the Effective Date.
2.
Respondent shall comply with the environmental
permit conditions listed in the findings of fact above.
3.
All submittals required by this Agreed Order,
unless IDEM notifies the Respondent otherwise in writing, shall be sent to:
Heather Foxx,
Enforcement Case Manager
Office of Air Quality
Indiana
Department of Environmental Management
100 North
Senate Avenue
Indianapolis,
IN 46204-2251
hfoxx@idem.in.gov
4.
Pursuant to IC 13-30-4-1, Respondent is
assessed and agrees to pay a civil penalty of Four Thousand Eight Hundred Dollars
($4,800.00). Said penalty amount shall
be due and payable to the Environmental Management Special Fund within thirty
(30) days of the Effective Date; the thirtieth day being the “Due Date.”
5.
Civil penalties are payable by check to the
“Environmental Management Special Fund.” Checks shall include the Case Number
of this action and shall be mailed to:
Indiana
Department of Environmental Management
Accounts
Receivable
IGCN, Room
1340
100 North
Senate Avenue
Indianapolis,
IN 46204
6.
In the event that the monies
due to IDEM pursuant to this Agreed Order are not paid on or before their Due
Date, Respondent shall pay interest on the unpaid balance at the rate
established by IC 24-4.6-1. The interest shall be computed as having accrued
from the Due Date until the date that Respondent pays any unpaid balance. Such
interest shall be payable to the Environmental Management Special Fund and
shall be payable to IDEM in the manner specified in Paragraph 5, above.
7.
Signatories to this Agreed Order certify that
they are fully authorized to execute this Agreed Order and legally bind the
party they represent.
8.
This Agreed Order shall apply to and be binding
upon Respondent and all successors and assigns. Respondent shall provide a copy
of this Agreed Order, if in force, to any subsequent owners, successors, or assigns
before ownership rights are transferred.
9.
No change in ownership, corporate, or
partnership status of Respondent shall in any way alter the Respondent’s status
or responsibilities under this Agreed Order.
10.
Respondent shall ensure that all contractors,
firms, and other persons performing work under this Agreed Order comply with
the terms of this Agreed Order.
11.
In the event that any terms of this Agreed
Order are found to be invalid, the remaining terms shall remain in full force
and effect and shall be construed and enforced as if this Agreed Order did not
contain the invalid terms.
12.
This Agreed Order is not and shall not be
interpreted to be a permit or a modification of an existing permit. This Agreed
Order, and IDEM’s review or approval of any submittal made by Respondent pursuant
to this Agreed Order, shall not in any way relieve Respondent of the obligation
to comply with the requirements of any applicable permits or any applicable
Federal or State laws or regulations.
13.
Complainant does not, by its approval of this
Agreed Order, warrant or aver in any manner that Respondent’s compliance with
any aspect of this Agreed Order will result in compliance with the provisions
of any permit, order, or any applicable Federal or State law or regulation.
Additionally, IDEM or anyone acting on its behalf shall not be held liable for
any costs or penalties Respondent may incur as a result of
Respondent’s efforts to comply with this Agreed Order.
14.
Nothing in this Agreed Order shall prevent or
limit IDEM’s rights to obtain penalties or injunctive relief under any
applicable Federal or State law or regulation, except that IDEM may not, and
hereby waives its right to, seek additional civil penalties for the violations
specified in the NOV.
15.
Nothing in this Agreed Order shall prevent IDEM
or anyone acting on its behalf from communicating with the U.S. Environmental
Protection Agency (“U.S. EPA”) or any other agency or entity about any matters
relating to this enforcement action. IDEM or anyone acting on its behalf shall
not be held liable for any costs or penalties Respondent may incur as a result of such communications with the U.S. EPA or any
other agency or entity.
16.
This Agreed Order shall remain in effect until
Respondent has complied with all terms and conditions of this Agreed Order and
IDEM has issued a Resolution of Case letter to Respondent.
TECHNICAL
RECOMMENDATION: |
|
RESPONDENT: |
|||||
Department
of Environmental Management |
|
Koetter
Woodworking, Inc. |
|||||
|
|
|
|||||
By: |
|
|
By: |
|
|||
|
David
P. McIver, Chief |
|
Printed: |
|
|||
|
Enforcement
Section |
|
Title: |
|
|||
|
Office
of Air Quality |
|
|
|
|||
Date: |
|
|
Date: |
|
|||
|
|
|
|
|
|||
|
|
|
|||||
COUNSEL
FOR COMPLAINANT: |
|
COUNSEL
FOR RESPONDENT: |
|||||
For
the Department of Environmental Management |
|
|
|||||
|
|
|
|||||
By: |
|
|
By: |
|
|||
|
|
|
|
|
|||
|
|
|
|
|
|||
Date: |
|
|
Date: |
|
|||
|
|
|
|
|
|||
APPROVED
AND ADOPTED BY THE INDIANA DEPARTMENT OF ENVIRONMENTAL |
|||||||
MANAGEMENT THIS |
|
DAY OF |
|
,
2020. |
|||
|
|||||||
|
For
the Commissioner: |
||||||
|
|
||||||
|
Signed
on September 4, 2020 |
||||||
|
Matthew
Stuckey Deputy Assistant |
||||||
|
Commissioner |
||||||
|
Office