Complainant and Respondent desire to settle and compromise this action without hearing or adjudication of any issue of fact or law, and consent to the entry of the following Findings of Fact and Order. Pursuant to Indiana Code (IC) 13-30-3-3, entry into the terms of this Agreed Order does not constitute an admission of any violation contained herein. Respondent's entry into this Agreed Order shall not constitute a waiver of any defense, legal or equitable, which Respondent may have in any future administrative or judicial proceeding, except a proceeding to enforce this order.

 

I. FINDINGS OF FACT

 

1.             Complainant is the Commissioner (Complainant) of the Indiana Department of Environmental Management (IDEM), a department of the State of Indiana created by IC 13-13-1-1.

 

2.             Respondent owns/operates which owns and operates the municipal wastewater treatment plant (WWTP), located at 809 S State Street, Greenfield, Hancock County, Indiana (the Site).

 

3.             Respondent is authorized by National Pollutant Discharge Elimination System (NPDES) Permit Number IN0020109 (the Permit) to discharge wastewater treated in accordance with the terms and conditions of the NPDES Permit from the Wastewater Treatment Plant (WWTP) into Brandywine Creek, via Outfall 001.

 

4.             IDEM has jurisdiction over the parties and the subject matter of this action pursuant to IC 13-30-3.

 

5.             Pursuant to IC 13-30-3-3, IDEM issued a Notice of Violation (NOV) via Certified Mail/personal service to:

 

Chuck Anderson

City of Greenfield

10 S State St

Room 111

Greenfield, Indiana 46140

 

6.             During an investigation on August 30, 2019 conducted by a representative of IDEM, violations were found, as described below.

 

7.             327 Indiana Administrative Code (IAC) 5-2-8(1), states the permittee shall comply with all terms and conditions of the Permit. Any permit noncompliance constitutes a violation of the Clean Water Act and Indiana Code (IC) 13 and is grounds for enforcement action by IDEM.

 

8.             Pursuant to Part II.B.1 of the Permit, the permittee is required to maintain in good working order and efficiently operate all facilities and systems and related appurtenances for collection and treatment in a manner which will minimize upsets and discharges of excessive pollutants.

 

During the inspection on August 30, 2019, IDEM staff observed and documented that there was a connection failure with a tank of Hypochlorite Solution that did not have an external holding apparatus causing about 300 gallons of Hypochlorite Solution to be released, in violation of Part II.B.1.

 

9.             Pursuant to 327 IAC 2-10-6, above ground storage tanks or storage areas containing hazardous materials that are located outside a building must have secondary containment.

 

During the inspection on August 30, 2019, IDEM staff observed and documented that the facility does not have a containment area for the Hypochlorite Solution totes to prevent the materials stored in the tank from entering waters of the state.  Respondent failed to provide adequate secondary containment for the Hypochlorite Solution storage tank, in violation of 327 IAC 2-10-6.

 

10.          Pursuant to 327 IAC 5-2-2, any discharge of pollutants into waters of the State, as a point source discharge, is prohibited unless in conformity with a valid NPDES permit obtained from IDEM prior to the discharge.

 

During the inspection on August 30, 2019, IDEM staff observed and documented that approximately 300 gallons of Hypochlorite Solution was released into Brandywine Creek, a water of the State, in violation of 327 IAC 5-2-2.

 

11.          Pursuant to IC 13-18-4-5, a person may not: (1) throw, run, drain, or otherwise dispose; or (2) cause, permit, or suffer to be thrown, run, drained, allowed to seep, or otherwise disposed; into any of the streams or waters of Indiana any organic or inorganic matter that causes or contributes to a polluted condition of any of the streams or waters of Indiana.

 

Pursuant to IC 13-30-2-1(1), it is unlawful for any person to discharge, emit, cause or allow any contaminant or waste, including any noxious odor, either alone or in combination with contaminants from other sources in the environment in any form that causes or would cause pollution that violates or would violate rules, standards, or discharge or emission requirements adopted by the appropriate board under the environmental management laws.

 

Pursuant to 327 IAC 2-1-6(a)(1), all surface waters at all times and at all places, including the mixing zone, shall meet the minimum conditions of being free from substances, materials, floating debris, oil or scum attributable to municipal, industrial, agricultural, and other land use practices or other discharges that do any of the following:

 

a.             will settle to form putrescent or otherwise objectionable deposits;

 

b.             are in amounts sufficient to be unsightly or deleterious;

 

c.              produce color, visible oil sheen, odor, or other conditions in such degree as to create a nuisance;

 

d.             are in concentrations or combinations that will cause or contribute to the growth of aquatic plants or algae to such degree as to create a nuisance, be unsightly, or otherwise impair the designated uses; and are in amounts sufficient to be acutely toxic to, or to otherwise severely injure or kill aquatic life, other animals, plants, or humans.

 

During the inspection on August 30, 2019, IDEM staff observed and documented that approximately 300 gallons of Hypochlorite Solution was released, resulting in a fish kill, in violation of IC 13-18-4-5, IC 13-30-2-1(1), and 327 IAC 2-1-6(a)(1).

 

12.          Pursuant to Part I.A.1 of the Permit, the permittee is required to comply with the monitoring requirements contained in the Permit, including effluent limitations.

 

Discharge Monitoring Reports (DMRs) and Monthly Reports of Operation (MROs) submitted by Respondent for the period of April 2019 through February 2020 revealed violations of effluent limitations contained in Part I.A.1 of the Permit as follows:

 

A.      The weekly maximum average concentration limitation for total suspended solids (TSS) was exceeded during June 2019, July 2019, and October 2019.

 

B.      The monthly average concentration limitation for TSS was exceeded during June 2019 and July 2019.

 

C.      The weekly maximum average concentration limitation for ammonia (as nitrogen) was exceeded during March, May, June, July, August, September, October, November, and December 2019.

 

D.      The monthly average concentration limitation for ammonia (as nitrogen) was exceeded during May, June, July, September, and October 2019.

 

E.      The daily maximum concentration limitation for copper, total recoverable, was exceeded during July and September 2019.

 

F.      The monthly average concentration limitation for copper, total recoverable, was exceeded during July and September 2019.

 

G.     The daily maximum concentration limitation for E. coli was exceeded during April, June, and July 2019.

 

H.      The monthly average concentration limitation for E. coli was exceeded during July and September 2019.

 

I.        The weekly maximum average concentration limitation for BOD, carbonaceous was exceeded during June, July, and September 2019.

 

J.       The monthly average concentration limitation for BOD, carbonaceous was exceeded during June, July, and September 2019.

 

Respondent failed to comply with the effluent limitations from Outfall 001 contained in the Permit, in violation of Part I.A.1 of the Permit.

 

13.          On September 09, 2019 and September 24, 2019, IDEM sent Inspection Summary Letters to Respondent outlining violations at the WWTP. The letters required a response detailing actions taken to correct the violations. IDEM received responses to the letters explaining compliance actions Respondent took or would take to address the violations. However, not all of the violations above  at the WWTP have been addressed.

 

14.          Orders of the Commissioner are subject to administrative review by the Office of Environmental Adjudication under IC 4-21.5; however, in recognition of the settlement reached, Respondent acknowledges notice of this right and waives any right to administrative and judicial review of this Agreed Order.

 

II. ORDER

 

1.             This Agreed Order shall be effective (Effective Date) when it is adopted by Complainant or Complainant’s delegate (as evidenced by signature), and the adopted Agreed Order has been received by Respondent. This Agreed Order shall have no force or effect until the Effective Date. In addition to addressing the violations cited in Paragraphs 8 through 12 of the Findings of Fact above, this Agreed Order also addresses any additional violations of these same rules that may have occurred subsequent to the issuance of the NOV and prior to the Effective Date.

 

2.             Respondent shall comply with rules and statutes listed in the findings above at issue.

 

3.             Within 60 days of the Effective Date, Respondent shall develop and submit to IDEM for approval a Compliance Plan (CP) which identifies actions that Respondent will take to achieve and maintain compliance with its Permit, specifically including the actions Respondent will take to:

A.      Achieve and maintain compliance with effluent limitations contained in the Permit, specifically TSS, ammonia (as nitrogen), copper, E.coli, and BOD;

B.      Develop and implement a preventative maintenance program for the sanitary sewer collection system, which includes methods and milestone dates for locating and eliminating sources of inflow and infiltration (I/I) in the sewer system;

 

The CP shall include an implementation and completion schedule, including specific milestone dates.

 

Respondent shall notify IDEM in writing of variations to the approved CP.

 

4.             Respondent shall, after completion of the work required pursuant to the approved CP from Paragraph 3 above, demonstrate 6 consecutive months of compliance (Compliance Demonstration) with the terms and conditions of the Permit.

 

5.             In the event that violation(s) occur during the Compliance Demonstration, within 30 days of the violation, Respondent shall develop and submit to IDEM, for approval, an Additional Action Plan (AAP) which identifies the additional actions that Respondent will take to achieve and maintain compliance with the terms and conditions of the Permit. The AAP, if required, shall include an implementation and completion schedule, including specific milestone dates.

 

6.             The plans required by Order Paragraphs 3 and 5 are subject to IDEM approval. In the event IDEM determines that any plan submitted by Respondent is deficient or otherwise unacceptable, Respondent shall revise and resubmit the plan to IDEM in accordance with IDEM’s notice. After three submissions of such plan by Respondent, IDEM may seek civil enforcement of this Order.

 

7.             Respondent, upon receipt of written notification from IDEM, shall immediately implement the approved plan(s) and adhere to the milestone dates therein. The approved CP and AAP shall be incorporated into the Agreed Order and shall be deemed an enforceable part thereof.

 

Following completion of the actions included in the AAP, the 6-month Compliance Demonstration, as specified in Paragraph 4 above, will re-start. Failure to achieve compliance at the conclusion of work under an AAP may subject Respondent to additional enforcement action.

 

8.             Beginning with the first calendar quarter following the Effective Date, Respondent shall submit to IDEM a written progress report within 10 days of the end of each calendar quarter, which identifies the compliance actions implemented during each quarter ending on March 31st, June 30th, September 30th, and December 31st until completion of the CP or AAP.

 

9.             Beginning on the Effective Date and continuing until the successful completion of the approved CP, Respondent shall, at all times, operate its existing WWTP as efficiently and effectively as possible.

 

10.          All submittals required by this Agreed Order, unless Respondent is notified otherwise in writing by IDEM, shall be sent to:

 

Delaney Isaacs, Enforcement Case Manager

Office of Water Quality – IGCN 1255

Indiana Department of Environmental Management

100 North Senate Avenue

Indianapolis, IN 46204-2251

 

11.          Respondent is assessed and agrees to pay a civil penalty of Seven Thousand Seven Hundred eighteen Dollars ($7,718.00). Said penalty amount shall be due and payable to the “Environmental Management Special Fund” within 30 days of the Effective Date, the 30th day being a “Due Date.”

 

12.          In the event the terms and conditions of the following paragraphs are violated, IDEM may assess and Respondent shall pay the corresponding stipulated penalty:

 

Paragraph

Violation

Stipulated Penalty

3

Failure to submit the CP within the required time period.

$250 per week late, or part thereof.

4

For violations of terms and conditions of the Permit during the Compliance Demonstration.

$400 per violation

5

Failure to submit the AAP, if required, within the given time period.

$500 per week late, or part thereof.

6

Failure to modify the CP and/or AAP, if required, within the given time period.

$500 per week late, or part thereof.

7

Failure to meet and/or implement any milestone date set forth in the approved CP or AAP.

$500 per week late, or part thereof.

8

Failure to submit to IDEM a written progress report within 10 days of each calendar quarter.

$150 per week late, or part thereof.

9

Failure to operate the WWTP as efficiently and effectively as possible prior to Compliance Demonstration.

$200 per violation.

 

13.          Stipulated penalties shall be due and payable no later than the 30th day after Respondent receives written notice that IDEM has determined a stipulated penalty is due, the 30th day being a “Due Date.” IDEM may notify Respondent at any time that a stipulated penalty is due. Failure to notify Respondent in writing in a timely manner of a stipulated penalty assessment shall not waive IDEM’s right to collect such stipulated penalty or preclude IDEM from seeking additional relief against Respondent for violation of this Agreed Order. Neither assessment nor payment of stipulated penalties shall preclude IDEM from seeking additional relief against Respondent for a violation of this Agreed Order. Such additional relief includes any remedies or sanctions available pursuant to Indiana law, including, but not limited to, civil penalties pursuant to IC 13-30-4.

 

14.          Civil and stipulated penalties are payable by check to the “Environmental Management Special Fund.” Checks shall include the Case Number 2020-26756-W of this action and shall be mailed to:

 

Indiana Department of Environmental Management

Accounts Receivable

IGCN, Room 1340

100 North Senate Avenue

Indianapolis, Indiana 46204

 

15.          This Agreed Order shall apply to and be binding upon Respondent, its successors and assigns. Respondent’s signatories to this Agreed Order certify that they are fully authorized to execute this Agreed Order and legally bind the party they represent. No change in ownership, corporate, or partnership status of Respondent shall in any way alter its status or responsibilities under this Agreed Order.

 

16.          In the event that the monies due to IDEM pursuant to this Agreed Order are not paid on or before their Due Date, Respondent shall pay interest on the unpaid balance and any accrued interest at the rate established by IC 24-4.6-1. The interest shall be computed as having accrued from the Due Date until the date that Respondent pays any unpaid balance. The interest shall continue to accrue on the first of each month until the civil penalty and any interest accrued are paid in full. Such interest shall be payable to the “Environmental Management Special Fund,” and shall be payable to IDEM in the manner specified above.

 

17.          In the event that any terms of this Agreed Order are found to be invalid, the remaining terms shall remain in full force and effect and shall be construed and enforced as if this Agreed Order did not contain the invalid terms.

 

18.          Respondent shall provide a copy of this Agreed Order, if in force, to any subsequent owners or successors before ownership rights are transferred. Respondent shall ensure that all contractors, firms and other persons performing work under this Agreed Order comply with the terms of this Agreed Order.

 

19.          This Agreed Order is not and shall not be interpreted to be a permit or a modification of an existing permit. This Agreed Order, and IDEM’s review or approval of any submittal made by Respondent pursuant to this Agreed Order, shall not in any way relieve Respondent of its obligation to comply with the requirements of its applicable permits or any applicable Federal or State law or regulation.

 

20.          Complainant does not, by his approval of this Agreed Order, warrant or aver in any manner that Respondent’s compliance with any aspect of this Agreed Order will result in compliance with the provisions of any permit, order, or any applicable Federal or State law or regulation. Additionally, IDEM or anyone acting on its behalf shall not be held liable for any costs or penalties Respondent may incur as a result of Respondent’s efforts to comply with this Agreed Order.

 

21.          Nothing in this Agreed Order shall prevent or limit IDEM’s rights to obtain penalties or injunctive relief under any applicable Federal or State law or regulation, except that IDEM may not, and hereby waives its right to, seek additional civil penalties for the same violations specified in the Notice of Violation.

 

22.          Nothing in this Agreed Order shall prevent IDEM (or anyone acting on its behalf) from communicating with the United States Environmental Protection Agency (US EPA) or any other agency or entity about any matters relating to this enforcement action. IDEM or anyone acting on its behalf shall not be held liable for any costs or penalties Respondent may incur as a result of such communications with the US EPA or any other agency or entity.

 

23.          This Agreed Order shall remain in effect until Respondent has complied with the terms and conditions of this Agreed Order and IDEM issues a Resolution of Case (close out) letter to Respondent.

 

TECHNICAL RECOMMENDATION:

RESPONDENT:

Department of Environmental Management

City of Greenfield

 

By: __________________________

By: ________________________

Samantha K. Groce, Chief

 

Water Enforcement Section

 

Surface Water, Operations &

Printed: _____________________

Enforcement Branch

 

Office of Water Quality

Title: _______________________

 

 

Date: ________________________

Date: _______________________

 

 

COUNSEL FOR RESPONDENT:

 

 

 

By: ________________________

 

 

 

Date: ______________________

 

APPROVED AND ADOPTED BY THE INDIANA DEPARTMENT OF ENVIRONMENTAL

MANAGEMENT THIS ___________ DAY OF ________________, 20___.

 

 

For the Commissioner:

 

 

Signed on September 23, 2020

 

Martha Clark Mettler

 

Assistant Commissioner

 

Office of Water Quality