LAPORTE, Ind. - The following lane restrictions and road closures are current or upcoming for the Indiana Department of Transportation (INDOT) LaPorte District. Comprised of 13 counties in Northwest Indiana, the LaPorte District includes Lake, Porter, LaPorte, St. Joseph, Newton, Jasper, Starke, Marshall, Pulaski, Fulton, White, Cass and Carroll counties.
The timeframe for many restrictions listed below are subject to change in the event of inclement weather. INDOT reminds motorists to use caution and consider worker safety when driving through highway construction zones. For the latest news and information about INDOT, please visit www.in.gov/indot.
Restrictions are listed by county and route number.
Cass County
- Project: US 24/SR 29/US 35 Asphalt Resurface between Burlington Ave. and Delaware Rd.
Details: Restricted to one lane in each direction
Timeframe: May 11 - August 2009
Fulton County
- Project: SR 14 Asphalt Resurface between SR 25 and SR 19
Details: Restricted to one 12-foot lane as directed by flag persons during daylight hours
Timeframe: April 4 - July 2009
Jasper/Pulaski counties
- Project: SR 114 Asphalt Resurface between CR 400 and US 421
Details: Restricted to one lane as directed by flag persons during daylight hours
Timeframe: April 13 - July 2009
Jasper/Starke counties
- Project: SR 10 Asphalt Resurface between SR 49 and US 421
Details: Restricted to one lane as directed by flag persons around a moving operation during daylight hours
Timeframe: May 11 - June 2009
Jasper/White counties
- Project: SR 16 Asphalt Resurface at various locations between US 231 and US 421
Details: Restricted to one lane as directed by flag persons around a moving operation during daylight hours
Timeframe: May 18 - June 2009
Lake County
- Project: SR 2 Road Rehabilitation from Illinois state line to US 41
Details: Restricted to one lane as directed by flag persons during daylight hours
Timeframe: April 2 - July 2009
- Project: US 41 Median Construction from 175th to 165th streets
Details: Restricted to one lane in each direction
Timeframe: March 3 - November 2009
- Project: US 41 RR Crossing Resurface Construction between SR 31 (Chicago Ave.) and Gostlin St.
Details: Closed to all traffic
Timeframe: May 15 - June 2009
- Project: US 41 Small Structure Replacement over Jane Feddeler Ditch, 0.5 miles N of US 231
Details: Restricted to one lane in each direction
Timeframe: June 22 - September 2009
- Project: SR 51 Asphalt Resurface from SR 130 to Central Ave.
Details: Restricted to one lane as directed by flag persons around a moving operation during daylight hours
Timeframe: May 20 - July 2009
- Project: SR 53 Median Construction from 0.94 miles N of US 30 to 2.25 miles N of US 30
Details: Restricted to one lane in each direction
Timeframe: March 16 - Summer 2009
- Project: I-80/94 Added Travel Lanes between SR 53 (Broadway) and Central Ave.
Details: Three lanes in each direction shifted N, featuring a unique EB lane configuration and the closure of five less-traveled ramps; Visit http://www.borman.in.gov/ for details. There also are varying nighttime lane restrictions
Timeframe: March 18 - November 2009
- Project: SR 152 city of Hammond watermain construction at 169th St.
Details: Restricted to one lane in each direction
Timeframe: June 22-26
Lake/Newton/Jasper counties
- Project: I-65 Road Rehabilitation from .056 miles S of SR 10 to 2.14 miles S of SR 2
Details: Restricted to one 12-foot lane in each direction; Wide Load Detour: SR 10 EB to US 231 NB to SR 2 WB
Timeframe: March 24 - November 2009
Marshall County
- Project: SR 10 Bridge Deck Overlay over Clarence Baker Ditch, 0.6 miles E of SR 331
Details: Closed to all traffic between SR 331 and SR 19; Detour: SR 331 SB to SR 110/SR 25 EB to SR 19 NB
Timeframe: June 8 - late July 2009
- Project: US 31 New Bridge Construction and Road Realignment over US 31 for Lilac Rd. and 6th Rd.
Details: US 31 restricted to one lane in each direction between US 30 and US 6; Lilac Rd./6th Rd. closed on both sides of US 31; Detour: Local roads utilizing Michigan Rd., 5A Rd., Lilac Rd., 5B Rd., Linden Rd. and 7B Rd.
Timeframe: Feb. 24 - October 2009
- Project: US 31 New Bridge Construction over US 31 for Plymouth-Goshen Trail
Details: US 31 restricted to one lane in each direction between US 30 and US 6; Plymouth-Goshen Trail closed between Lilac Rd. and County Road 7B/Linden Rd. Detour: Lilac Rd. NB to CR 7B EB
Timeframe: Feb. 24 - October 2009
Marshall/St. Joseph counties
- Project: US 31 New Bridge Construction and Road Realignment over US 31 for Lilac Rd. and Tyler Rd.
Details: Lilac Rd. is closed between 1st Rd. and Tyler Rd. Tyler Rd. is closed between US 31 and Linden Rd. Local Detours Utilize: US 31, CR 100N, 1st Rd. and King Rd.
Timeframe: April 17 - August 2009
Newton County
- Project: SR 55 CSX RR Crossing Resurface Construction between SR 10 and SR 2 in the town of Thayer
Details: Closed to all traffic
Timeframe: April 15-19
Porter County
- Project: SR 2/US 231 Road Reconstruction from S town limits to N town limits of Hebron and SR 8 Road Reconstruction from SR 2/US 231 to Norbeh Dr.
Details: SR 2/US 231 closed to all traffic between Jackson St. and Aylea St. Detour: SR 2 WB to I-65 NB to US 231 SB; SR 8 closed to all traffic between SR 2/US 231 and Norbeh Dr. Detour: US 231 NB to I-65 SB to SR 2 EB to US 231 SB to SR 10 EB to SR 49 NB
Timeframe: March 16 - Fall 2009
- Project: US 6 Intersection Improvement at Mander Rd.
Details: Closed to all traffic between SR 49 and SR 2; Detour: SR 49 SB to SR 2 WB
Timeframe: April 13 - July 2009
- Project: SR 149 Asphalt Resurface from SR 130 to US 20
Details: Restricted to one lane as directed by flag persons around a moving operation during daylight hours
Timeframe: May 18 - August 2009
Pulaski/Starke counties
- Project: US 35 Asphalt Resurface from SR 14 to SR 10
Details: Restricted to one lane as directed by flag persons around a moving operation during daylight hours
Timeframe: June 11 - October 2009
St. Joseph County
- Project: SR 331 Small Structure Replacement over Madison Township Ditch, 5.6 miles S of US 20
Details: Closed to all traffic
Timeframe: June 15 - late July 2009
- Project: SR 933 Resurface Construction from Angela Blvd. to Michigan state line
Details: Restricted to one lane in each direction
Timeframe: March 23 - August 2009
White County
- Project: US 24 Resurface Construction from SR 43/US 421 to SR 39
Details: Restricted to one lane as directed by flag persons during daylight hours
Timeframe: April 11 - July 2009
- Project: US 421 Intersection Improvement with Added Turn Lanes at CR100N
Details: Restricted to one lane as directed by flag persons during daylight hours
Timeframe: April 24 - July 2009
- Project: Bridge Replacement over Little Monon Creek, 0.72 miles south of SR 16
Details: Restricted to one lane as directed by a temporary traffic signal
Timeframe: May 11 - July 2009
--30--
« Back to News Release List
Link to this event: