2019
Most Department of Natural Resources construction projects are bid through the Department of Administration, Division of Public Works.
As directed by State of Indiana laws and Indiana Department of Administration (IDOA) policy, all entities (“vendors”) conducting business with DNR must be a registered state vendor before we can create a purchase order or make a payment.
This page was developed to distribute project and bid information for projects estimated at $150,000 and above. When downloading from this site, you will NOT be placed on the plan holders list. By downloading files from this site, you agree to check this site for any and all addenda. By submitting a bid, the bidder acknowledges procurement of all addenda. All times are Eastern. File formats are PDF.
The documents on this page are intended for potential state contractors and contain technical drawings. If you use assistive technology and the format of any material on this page interferes with your ability to access information, please contact the Division of Engineering.
Project name and number | REBID - DEL2006321280 – Winona Lake Outlet Structure |
---|---|
Notice to bidders, bid date, time | DEL2006321280 – November 21, 2019 @ 1:31 PM |
Pre-bid meeting date, time, location | October 24, 2019 @ 2:00 PM (local time) Located at Winona Lake Outlet Structure Warsaw, IN |
Pre-qualification required | 1622.01 or 1629.03 or 1771.01 |
Project specifications | DEL2006321280 – Specs 1 DEL2006321280 – Specs 2 |
Plans | DEL2006321280 – Plans |
Meeting minutes, addenda, clarification requests due | DEL2006321280 - Addendum 1 |
Other documents | DEL2006321280-Meeting Minutes |
Unofficial results | |
Date entered/last modified | Nov. 13, 2019 3:45 p.m. |
Project name and number | DEL1915208422 / E008283 – Reclamation – AML Site 1813 – Cougar Highwall |
---|---|
Notice to bidders, bid date, time | DEL1915208422 / E008283 – November 7, 2019 @ 1:31 PM |
Pre-bid meeting date, time, location | Thursday, October 17, 2019 @ 10:00 AM (ET) Located at the Project Site |
Pre-qualification required | 1799.04 |
Project specifications | DEL1915208422 / E008283 – Specs |
Plans | DEL1915208422 / E008283 – Plans |
Meeting minutes, addenda, clarification requests due | E008283 – Pre Bid Sign In E008283 – Pre Bid Meeting Summary E008283 - Clarification |
Other documents | CAD Drawings |
Unofficial results | E008283 - Bid Tab |
Date entered/last modified | Dec. 12, 2019 2:45 p.m. |
Project name and number | ENG2003722076 – Brown County SP – Campground Electrical Improvements |
---|---|
Notice to bidders, bid date, time | ENG2003722076 – October 3, 2019 @ 1:31 PM |
Pre-bid meeting date, time, location | September 17, 2019 @ 10:30 AM (local time) Located at Brown County State Park Office |
Pre-qualification required | 1731.04 |
Project specifications | ENG2003722076 – Specs |
Plans | ENG2003722076 – Plans |
Meeting minutes, addenda, clarification requests due | ENG2003722076 – Addendum 1 |
Other documents | |
Unofficial results | |
Date entered/last modified | Sept. 26, 2019 2:00 p.m. |
Project name and number | ENG1803727638 – Fort Harrison State Park – Building 803 Conversion |
---|---|
Notice to bidders, bid date, time | ENG1803727638 – October 17, 2019 @ 4:01 PM |
Pre-bid meeting date, time, location | Tuesday, September 24, 2019 @ 10:00 AM (local time) Located at the Project Site |
Pre-qualification required | NA |
Project specifications | ENG1803727638 – Specs |
Plans | ENG1803727638 – Plans |
Meeting minutes, addenda, clarification requests due | ENG1803727638 – Pre-Bid Notes |
Other documents | |
Unofficial results | ENG1803727638 – Bid Results |
Date entered/last modified | Oct. 22, 2019 12:15 p.m. |
Project name and number | E005300 / DEL1915208634 – Reclamation – AML Site 2305 – Collie Pond |
---|---|
Notice to bidders, bid date, time | E005300 – DEL1915208634 – August 29, 2019 @ 1:31 PM |
Pre-bid meeting date, time, location | Thursday, August 8, 2019 @ 10:00 AM (ET) Located at the Project Site |
Pre-qualification required | 1799.04 |
Project specifications | E005300 / DEL1915208634 – Specs |
Plans | E005300 / DEL1915208634 – Plans |
Meeting minutes, addenda, clarification requests due | |
Other documents | E005300 / DEL1915208634 – Water Data CAD Drawings Pre-Bid Meeting Summary Pre-Bid Meetings Sign In href="https://www.in.gov/dnr/engineering/files/en-E005-300_ALKALINE_MATERIAL.PDF"> |
Unofficial results | E005300 / DEL1915208634 – Bid Results |
Date entered/last modified | Oct. 11, 2019 1:20 p.m. |
Project name and number | E008304 / DEL1915208405 – Reclamation – AML Site 345 – Linton No 1 |
---|---|
Notice to bidders, bid date, time | E008304 – DEL1915208405 – August 22, 2019 @ 1:31 PM |
Pre-bid meeting date, time, location | Thursday, August 1, 2019 @ 10:00 AM Located at the Project Site |
Pre-qualification required | 1799.04 |
Project specifications | E008304 / DEL1915208405 – Specs |
Plans | E008304 / DEL1915208405 – Plans |
Meeting minutes, addenda, clarification requests due | E008304 / DEL1915208405- Addendum 1 E008304 / DEL1915208405 – Clarification |
Other documents | CAD Drawing 1 CAD Drawing 2 Pre Bid Meeting Sign In Pre Bid Meeting Summary href="/dnr/engineering/files/en-E008304_WATER_DATA.pdf"> |
Unofficial results | E008304 – DEL1915208405 – Bid Results |
Date entered/last modified | Oct. 22, 2019 3:45 p.m. |
Project name and number | ENG1902899363 – Crosley FWA – Office Remodeling |
---|---|
Notice to bidders, bid date, time | ENG1902899363 – May 30, 2019 @ 1:31 PM& |
Pre-bid meeting date, time, location | May 16, 2019 @ 10:00 AM at the Crosley FWA Office |
Pre-qualification required | 1542.01 or 1542.02 or 1542.04 |
Project specifications | ENG1902899363 – Specs |
Plans | ENG1902899363 – Plans A-2.pdf 1-G-1.pdf 2-G-2.pdf 3-C-1.pdf 4-A-1.pdf href="/dnr/engineering/files/en-6-A-3.pdf"> |
Meeting minutes, addenda, clarification requests due | |
Other documents | |
Unofficial results | ENG1902899363 – Bid Results |
Date entered/last modified | June 3, 2019 3:55 p.m. |
Project name and number | E008299 / DEL1916208510 – Reclamation – AML Site 2295 – Crosstown Grouting |
---|---|
Notice to bidders, bid date, time | E008299 / DEL1916208510 – April 4, 2019 @ 1:31 PM |
Pre-bid meeting date, time, location | N/A |
Pre-qualification required | 1799.13 |
Project specifications | E008299 / DEL1916208510 – Specifications |
Plans | E008299 / DEL1916208510 – Plans |
Meeting minutes, addenda, clarification requests due | E008299.zip - CAD E008299-1 - Water Data E008299-2 - Bore Logs |
Other documents | E008299 – Clarification |
Unofficial results | E008299 – Bid Results |
Date entered/last modified | Apr. 10, 2019 2:25 p.m. |