Rulemaking Docket
The Rulemaking Docket is not available at this time.
Subject Matter of Rule
This rulemaking readopts:
170 IAC 1-2 | Construction and Filing of Schedules of Rates, Tolls and Charges by Public Utilities |
170 IAC 1-3 | Advertising Expenditures by Public Utilities |
170 IAC 1-5 | Minimum Standard Filing Requirements for an Expedited Rate Case |
170 IAC 4-1 | Electric Utilities; Standards of Service |
170 IAC 4-1.5 | Service to New Buildings |
170 IAC 4-2 | Classification of Accounts |
170 IAC 4-3 | Electric Supply and Signal Lines; Principles of Safety; Co-ordination with Other Utilities |
170 IAC 4-4.1 | Cogeneration and Alternate Energy Production Facilities |
170 IAC 4-4.2 | Net Metering |
170 IAC 4-4.3 | Customer Generator Interconnection Standards |
170 IAC 4-5 | Electric Submeters of Master Meter Accounts |
170 IAC 4-6 | Ratemaking Treatment of Qualified Pollution Control Property Under Construction |
170 IAC 4-7 | Guidelines for Integrated Resource Planning by an Electric Utility |
170 IAC 4-8 | Guidelines for Demand-Side Cost Recovery by Electric Utilities |
170 IAC 4-9 | Vegetation Management Standards |
170 IAC 5-1 | Gas Utilities; Standards of Service |
170 IAC 5-2 | Classification of Accounts |
170 IAC 6-1 | Water; Standards of Service |
170 IAC 6-1.1 | Distribution System Improvement Charges (DSIC) |
170 IAC 6-1.5 | Extension of Water Mains |
170 IAC 6-2 | Classification of Accounts for Class A, B, and C Water Utilities |
170 IAC 6-5 | Water Tracker Procedure |
170 IAC 8-2 | Private Rural Sewage Utilities |
170 IAC 8.5-1 | Sewage Disposal Services |
170 IAC 8.5-2 | Customer Rights and Responsibilities |
170 IAC 8.5-3 | Operation of Sewage Lines |
170 IAC 8.5-4 | Extension of Sewer Mains |
170 IAC 8.6-1 | Sewer Tracker |
170 IAC 10-1 | Preservation of Records-Telephone Companies |
170 IAC 10-2 | Preservation of Records-Electric, Gas & Water |
170 IAC 11-1 | Combination Gas and Electric Private Utilities |
Rulemaking Status
- Initial Notice of Readoption to Legislature
- Notice of Readoption
- Comment Period
- Final Rule for Readoption
- Final Rule
Notices/Documents
To view notices and documents related to this rulemaking, please click here.
Comment Time Period
The comment period is to be determined at a later date.
How to Submit Comments
If you have any questions or would like to submit comments related to this rulemaking, please contact Assistant General Counsel Jeremy Comeau:
Indiana Utility Regulatory Commission
101 West Washington Street, Suite 1500E
Indianapolis, Indiana 46204
(317) 232-2102 | Email
Public Comments Received
Public comments can be found here.
Relevant Scientific and Technical Findings
N/A