INDOT Archived Standard Drawings–Section 700 Doing Business with INDOT — Standards and Specifications Standard Drawings Section 700 Structures ARCHIVED DRAWINGS Ref. CODE Source Page CODE MEANING SignatureDate 701 BPIL 2 Bridge Pilings 1/2/98 701 BPIL 04 Bridge Pilings 09/01/10 701 BPIL 05 Bridge Pilings 05/01/98 701 BPIL 5 Bridge Pilings 9/30/94 701 BPIL 06 Bridge Pilings 09/01/10 704 BDCG 1 Bridge Drain Castings & Grates 4/3/95 704 BDCG 03 Bridge Drain Castings & Grates 09/30/94 704 BDCG 04 Bridge Drain Castings & Grates 09/30/94 704BDCG5Bridge Drain Castings & Grates06/03/96 706 BCBR 1 Bridge Concrete Barrier Rail 9/1/97 706 BCBR 1 Bridge Concrete Barrier Rail 9/1/98 706 BCBR 2 Bridge Concrete Barrier Rail 9/1/97 706 BCBR 2 Bridge Concrete Barrier Rail 9/1/98 706 BCBR 3 Bridge Concrete Barrier Rail 9/1/97 706 BCBR 4 Bridge Concrete Barrier Rail 9/1/97 706 BCBR 4 Bridge Concrete Barrier Rail 9/1/98 706 BRPP 01 Bridge Railing Parapet Pedestrian 09/01/05 706 BRPP 02 Bridge Railing Parapet Pedestrian 09/04/07 706 BRTM 01 Bridge Railing Top Mount 09/03/02 706 CBRT 01 Concrete Bridge Railing Transition 05/01/00 706 CBRT 1 Concrete Bridge Railing Transition 9/1/98 706 CBRT 02 Concrete Bridge Railing Transition 09/01/09 706 CBRT 03 Concrete Bridge Railing Transition 05/01/00 706 TASE 02 Transition Approach Slab Extension 09/01/06 706 TBRC 01 Retrofit Thrie Beam Bridge Railing 09/01/06 706 TBRC 02 Retrofit Thrie Beam Bridge Railing 03/01/05 706 TBRF 01 Retrofit Thrie Beam Bridge Railing 03/01/05 706 TTBC 01 Transition Thrie Beam Common 03/01/04 706 TTBC 02 Transition Thrie Beam Common 09/01/06 706 TTBC 03 Transition Thrie Beam Common 03/03/03 706 TTBP 01 Concrete Bridge Railing Transition, TPF-1 09/01/09 706 TTBP 03 Concrete Bridge Railing Transition, TPF-2 09/01/09 706 TTBP 05 Concrete Bridge Railing Transition, TPS-1 09/01/09 706 TTBP 07 Concrete Bridge Railing Transition, TPS-2 09/01/09 706 TTBT 01 Transition Thrie Beam Truck 09/01/06 706 TTBT 1 Transition Thrie Beam Truck 9/1/98 706 TTBT 03 Transition Thrie Beam Truck 09/01/06 706 TTBT 2 Transition Thrie Beam Truck 9/1/98 706 TTTX 01 Conc. Bridge Railing Transition Type TTX 09/01/09 706 TWBC 01 Transition W-Beam Common 03/03/03 707 BPBF 01 Bridge Precast Beam Fabrication 09/01/04 707 BPBF 02 Bridge Precast Beam Fabrication 05/01/00 707 BPBF 03 Bridge Precast Beam Fabrication 09/01/09 711 BSTS 1 Bridge Steel Shoes 5/1/97 711 BSTS 3 Bridge Steel Shoes 8/1/96 711 BSTS 4 Bridge Steel Shoes 8/1/96 713 TCTR 01 Traffic Control Temporary Runaround 09/01/06 713 TCTR 02 Traffic Control Temporary Runaround 09/01/06 713 TCTR 02A Traffic Control Temporary Runaround 09/01/06 713 TCTR 03 Traffic Control Temporary Runaround 09/01/07 713 TCTR 4 Traffic Control Temporary Runaround 9/1/97 714 BCJT 01 Box Culvert Joint 05/03/99 714 BCSP 02 Box Culvert Sumping Protection 09/01/10 715 PCES 1 Precast Concrete End Section 1/2/98 715 PHCL 19 Pipe Height of Cover Limits 1/2/98 715 PIPE 02 Pipe 09/01/10 720 EDCA 1 Earth Ditch Casting 4/3/95 720 ICCA 3 Inlet/Catch Basin Casting 4/3/95 720 ICCA 4 Inlet/Catch Basin Casting 4/3/95 720 ICCA 5 Inlet/Catch Basin Casting 4/3/95 720 ICCA 6 Inlet/Catch Basin Casting 4/3/95 720 ICCA 8 Inlet/Catch Basin Casting 4/3/95 720 ICCA 9 Inlet/Catch Basin Casting 4/3/95 720 ICCA 10 Inlet/Catch Basin Casting 4/3/95 720 ICCA 11 Inlet/Catch Basin Casting 4/3/95 720 ICCA 12 Inlet/Catch Basin Casting 4/3/95 720 ICCA 13 Inlet/Catch Basin Casting 4/3/95 720 ICCA 15 Inlet/Catch Basin Casting 4/3/95 720 ICCA 16 Inlet/Catch Basin Casting 4/3/95 720 ICCA 18 Inlet/Catch Basin Casting 4/3/95 720 ICCA 19 Inlet/Catch Basin Casting 4/3/95 720 ICCA 20 Inlet/Catch Basin Casting 4/3/95 720 ICCA 21 Inlet/Catch Basin Casting 4/3/95 720 INCA 1 Inlet Casting 4/3/95 720 INCA 2 Inlet Casting 4/3/95 720 INST 8 Inlet Structure 9/1/97 720 INST 9 Inlet Structure 9/1/97 720 MHCA 1 Manhole Casting 4/3/95 720 MHCA 2 Manhole Casting 1/2/96 720 MHCA 3 Manhole Casting 4/3/95 720 MHST 1 Manhole Structures 4/3/95 720 SDCP 1 Slotted Drain Cleanout Port 5/1/98 720 SDCP 2 Slotted Drain Cleanout Port 5/1/98 720 SDCP 3 Slotted Drain Cleanout Port 5/1/98 724 BJTS 1 Bridge Joints 1/3/95 [an error occurred while processing this directive] INDOT Events More News & Events Top FAQs