Language Translation
  Close Menu
INDOT: Division 200 RSPs (2022 SS)

Recurring Special Provisions and Plan Details

Effective for Lettings with the 2022 INDOT Standard Specifications

| RSP Home | Division 100 | Division 200 | Division 300 | Division 400 |

| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |

*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for the correct letting date you need

Division 200 - Earthwork

RSP or RPD
Description
Revision Date*
Letting Date**
Recycled Foundry Sand
04/25/21
09/01/21
Initial Payment for Clearing Right-of-Way (edit.)
05/02/19
09/01/19
Initial Payment for Clearing Right-of-Way
08/18/22
03/01/23
Debris Removal at Bridge Structures
04/25/21
09/01/21
Houses and Buildings Demolition (edit.)
11/14/18
06/01/19
Inspection and Testing for Asbestos Material
04/25/21
09/01/21
Removal of Structures and Obstructions
05/20/21
12/01/21
Removal of Existing Traffic Signal Equipment (edit.)
11/30/06
09/01/13
Marion County Borrow Areas
04/25/21
09/01/21
Borrow Area Wetland Enhancement
04/25/21
09/01/21
Granular Tire Shreds
04/25/21
09/01/21
Excavation and Embankment
10/21/21
03/01/22
Excavation and Embankment
11/18/22
06/01/23
Discovery of Karst Features within the Construction Limits
10/21/21
03/01/22
Geotechnical Instrumentation
05/20/21
12/01/21
Temporary Turbidity Curtain
02/21/13
09/01/13
Temporary Erosion Control Turbidity Curtain
02/21/13
07/01/13
Pump Around
09/16/21
03/01/22
Steel Sheet Piling at Railroad Grade Separation
04/25/21
09/01/21
Dewatering
04/25/21
09/01/21
Structure Excavation
05/20/21
12/01/21
Subgrade
05/20/21
12/01/21
Gore Area Treatment
05/02/19
09/01/19
B Borrow and Structure Backfill
05/20/21
12/01/21
Geosynthetics
09/16/21
12/01/21
Geosynthetics
11/18/22
06/01/23
Cellular Concrete Fill, CCF
10/21/21
03/01/22
Cellular Concrete Fill, CCF
10/20/22
03/01/23
QC/QA for Soil Fill Sections and QC/QA for Subgrade
02/18/21
09/01/21

INDOT Events

More News & Events

Top FAQs