Indiana Department of Transportation
INDOT > Doing Business with INDOT > Standards and Specifications >Recurring Special Provisions & Plan Details > September 2011 Edition Recurring Special Provisions & Plan Details
Effective for Lettings on or after September 1, 2011
| RSP Home | Section 100 | Section
200 | Section 300 | Section 400 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised
**Letting Date = Effective for use on lettings on or after this date - Be sure to select the RSP or RPD for
the correct letting date you need
Section 200 - Earthwork
RSP or RPD |
Description |
Rev. Date* |
Letting Date** |
Recycled Foundry Sand | 10/20/11 |
03/01/12 |
|
Initial Payment for Clearing Right-of-Way (edit.) | 09/01/05 |
09/01/11 |
|
Clearing Right-Of-Way | 03/15/12 |
09/01/12 |
|
Debris Removal at Bridge Structures | 09/01/05 |
09/01/11 |
|
Open Burning of Natural Growth Permitted | 09/01/05 |
09/01/11 |
|
Air-Curtained Open-Pit Incineration of Natural Growth Required | 09/01/05 |
09/01/11 |
|
Inspection and Testing for Asbestos Material | 09/01/05 |
09/01/11 |
|
Election to Produce Recycled Concrete Aggregate | 11/01/07 |
09/01/11 |
|
Mandatory to Production of Recycled Concrete Aggregate | 11/01/07 |
09/01/11 |
|
Removal of RCBA and Reinforced Concrete Moment Slabs | 01/19/12 |
09/01/12 |
|
Removal of Existing Traffic Signal Equipment (edit.) | 11/30/06 |
09/01/11 |
|
Marion County Borrow Areas | 09/01/05 |
09/01/11 |
|
Borrow Area Wetland Enhancement | 09/01/05 |
09/01/11 |
|
Embankments Constructed of Coal Combustion By-Products | 09/01/05 |
09/01/11 |
|
Approval of Borrow and Disposal Sites | 05/23/11 |
09/01/11 |
|
Dynamic Cone Penetrometer Testing for Embankment | 12/20/12 |
03/01/13 |
|
Common Excavation | 03/15/12 |
09/01/12 |
|
Temporary Erosion and Sediment Control | 02/21/13 |
04/01/13 |
|
Temporary Turbidity Curtain | 02/21/13 |
07/01/13 |
|
Temporary Erosion Control Turbidity Curtain | 02/21/13 |
07/01/13 |
|
Steel Sheet Piling at Railroad Grade Separation | 09/01/05 |
09/01/11 |
|
Chemical Modifiers for Soils | 08/24/11 |
09/01/11 |
|
Gore Area Treatment | 09/01/05 |
09/01/11 |
|
Crushed Glass as Bedding Material | 09/01/05 |
09/01/11 |
|
Type 3 Structure Backfill Requirements | 12/20/12 |
03/01/13 |
|
Flowable Backfill DCP Test Minimum Blow Count | 12/01/11 |
03/01/12 |
|
Geogrid and Geogrid Materials | 12/20/12 |
03/01/13 |