Indiana Department of Transportation
INDOT > Doing Business with INDOT > Standards and Specifications >Recurring Special Provisions & Plan DetailsSeptember 01, 2011 Edition Recurring Special Provisions & Plan Details
Effective for Lettings on or after September 1, 2011
| RSP Home | Section 100 | Section
200 | Section 300 | Section 400 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
| Section 500 | Section 600 | Section 700 | Section 800 | Section 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised
**Letting Date = Effective for use on lettings on or after this date - Be sure to select the RSP or RPD for
the correct letting date you need
Section 700 - Structures
RSP or RPD |
Description |
Rev. Date* |
Letting Date** |
Pile Driving (edit.) | 04/19/11 |
09/01/11 |
|
Pile Alignment | 11/16/12 |
03/01/13 |
|
Concrete Floor Slabs | 03/15/12 |
09/01/12 |
|
Bridge Railing Type TS-1 & Guardrail Transition Type TGS-1 |
04/15/10 |
09/01/11 |
|
Bridge Railing Pedestrian Fence | 10/20/11 |
07/01/12 |
|
Bridge Railing | 02/16/12 |
09/01/12 |
|
Concrete Bridge Railing Transition, TFC | 09/20/12 |
01/01/13 |
|
Reinforced Concrete Moment Slab | 03/15/12 |
09/01/12 |
|
Interior Diaphragms | 05/24/06 |
09/01/11 |
|
Detensioning Precast Prestressed Structural Members | 10/20/11 |
03/01/12 |
|
Precast Concrete Deck Panels | 03/15/12 |
09/01/12 |
|
Peening Welds By Means Of Ultrasonic Impact Treatment | 09/15/11 |
03/01/12 |
|
Structural Steel, General | 03/15/12 |
09/01/12 |
|
WWR Used in Reinforced Concrete Box Structures | 11/16/11 |
04/01/12 |
|
Reinforced Concrete Box Structure Requirements | 06/21/12 |
10/01/12 |
|
Three-Sided Structure Footings | 09/15/11 |
03/01/12 |
|
WWR Used in Three-Sided Structure | 11/16/11 |
04/01/12 |
|
Reinforced Concrete Three-Sided Structure Requirements | 06/21/12 |
10/01/12 |
|
Approved Expansion Joint SS Devices | 03/21/06 |
09/01/11 |
|
Expansion Joint Sealing System | 12/16/10 |
09/01/11 |
|
Alternate SS Joint Part | 01/22/01 |
09/01/11 |
|
Tooth Expansion Joint For Integral Structures | 06/21/12 |
10/01/12 |
|
Pipe Lining | 05/01/12 |
05/01/12 |
|
Drilled Shaft Foundations | 03/21/13 |
07/01/13 |
|
QC/QA Superstructure Concrete | 05/23/11 |
09/01/11 |
|
MSE Provisions | 03/15/12 |
09/01/12 |
|
Modular Concrete Block Retaining Walls | 05/23/11 |
09/01/11 |
|
Modular Concrete Block Retaining Walls | 02/21/13 |
06/01/13 |
|
Limiting Movement Criteria For Permanent Earth Retention System For Cut-Wall Application (edit.) | 08/20/09 |
09/01/11 |
|
Silica Fume Modified Structural Concrete Bridge Deck Overlay | 05/23/11 |
09/01/11 |
|
Welded Wire Reinforcement | 11/16/11 |
04/01/12 |