Effective for Lettings with the 2024 INDOT Standard Specifications
| RSP Home | Division 100 | Division
200 | Division 300 | Division 400 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for
the correct letting date you need
Division 100 - General Provisions
RSP or RPD |
Description |
Rev. Date* |
Letting Date** |
Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN20230001 | 06/16/22 |
01/06/23 |
|
Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN20230006 | 06/16/22 |
01/06/23 |
|
Payment of Predetermined Minimum Wage Determination (Davis-Bacon Act) IN______ (edit.) | 06/16/22 |
12/01/22 |
|
FHWA - 1273 | 10/23/23 |
10/23/23 |
|
Executive Order 11246 | 05/20/23 |
09/01/23 |
|
Title VI Assurances | 05/21/15 |
08/01/15 |
|
Standard Specifications | 05/20/23 |
09/01/23 |
|
Indiana Department of Administration M/WBE and IVOSB Participation Policy for Indiana Department of Transportation Construction Projects | 07/19/18 |
12/01/18 |
|
E-Mail Submittal of Electronic Documents for Bid Express | 04/23/08 |
09/01/13 |
|
Alternate Pavement Divisions, Present Value Cost And Pavement Division For Construction Of The Mainline, Shoulders And Ramps (edit.) | 06/19/15 |
09/01/15 |
|
Cargo Preference Act | 01/07/16 |
02/01/16 |
|
MBE, WBE, and IVOSB Participation Plan Protocols | 06/17/21 |
12/01/21 |
|
PG Binder Grades | 10/19/23 |
09/01/24 |
|
Structure Numbers for Pay Items (edit.) | 09/01/05 |
09/01/13 |
|
Joint Venture | 07/18/24 |
12/01/24 |
|
Schedule of Pay Items for Option Bids (edit.) | 04/25/21 |
09/01/21 |
|
Prequalification | 05/02/19 |
09/01/19 |
|
Owners' and Contractors's Protective Liability Insurance Coverage for Operations of the Designated Contractor (edit.) | 05/20/23 |
09/01/23 |
|
DBE Joint Check Request Form | 12/11/14 |
02/01/15 |
|
Indiana-Kentucky DBE Reciprocity | 05/20/23 |
09/01/23 |
|
Submittal of DBE Quotes | 06/17/21 |
12/01/21 |
|
DBE Affirmative Action Certificate Protocols | 06/17/21 |
12/01/21 |
|
Traffic Control Changes and On-Call Maintenance of Traffic Control Devices (edit.) | 05/20/23 |
09/01/23 |
|
Schedule of Operations and Traffic Control for Undersealing, Concrete Patching, Placing Underdrains and Resurfacing (edit.) | 05/20/23 |
09/01/23 |
|
Construction Engineering and Inspection for Utility Relocation | 03/01/10 |
09/01/13 |
|
GPS Rover for Use by Project Personnel | 09/19/13 |
12/01/13 |
|
Bridge Inspection Coordination (edit.) | 04/20/23 |
09/01/23 |
|
Build America, Buy America Act Requirements | 02/15/24 |
09/01/24 |
|
E-Ticketing Incentive | 06/15/23 |
12/01/23 |
|
Environmental Restrictions | 05/20/23 |
09/01/23 |
|
Inspection Hole | 05/21/15 |
01/01/16 |
|
Maintaining Pedestrian Accessibility During Construction | 02/20/20 |
09/01/20 |
|
Migratory Bird Protection | 09/16/21 |
03/01/22 |
|
Statements About Existing Conditions of Utilities, Additional Right-of-Way, and Encroachments (edit.) | 05/20/23 |
09/01/23 |
|
Statements About Existing Conditions of Utilities, Additional Right-of-Way, and Encroachments (edit.) | 07/18/24 |
03/01/25 |
|
Incentive For Opening Project To Traffic Ahead of Schedule (edit.) | 05/20/23 |
09/01/23 |
|
Percentage of Work Required of Prime Contractor | 05/23/13 |
09/01/13 |
|
Latest Date to Begin Work (edit.) | 05/20/23 |
09/01/23 |
|
Failure to Complete on Time For Restriction (edit.) | 05/20/23 |
09/01/23 |
|
Failure to Complete on Time for Restrictions - 2 or More Locations (edit.) | 05/20/23 |
09/01/23 |
|
Failure to Complete on Time for Road Closure (edit.) | 05/20/23 |
09/01/23 |
|
Failure to Complete on Time for Intermediate Completion Date (edit.) | 05/20/23 |
09/01/23 |
|
Earliest Date To Begin Work | 05/20/23 |
09/01/23 |
|
Storm Water, Erosion, and Sediment Control Inspection Report | 04/19/12 |
09/01/13 |
|
Critical Path Method Schedule | 05/20/23 |
09/01/23 |
|
Contract Completion due to Notice of Termination, NOT | 08/10/23 (editorial) |
09/01/22 |
|
Project Estimate Adjustment | 07/27/07 |
09/01/13 |
|
IDIQ Work Orders | 03/21/24 |
09/01/24 |
|
State Funded Contract Requirements | 09/01/05 |
09/01/13 |
|
State Funded Contract Requirements | 05/17/24 |
12/01/24 |