Effective for Lettings with the 2024 INDOT Standard Specifications
| RSP Home | Division 100 | Division
200 | Division 300 | Division 400 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for
the correct letting date you need
Division 200 - Earthwork
RSP or RPD |
Description |
Revision Date* |
Letting Date** |
Recycled Foundry Sand | 05/20/23 |
09/01/23 |
|
Initial Payment for Clearing Right-of-Way | 08/18/22 |
03/01/23 |
|
Debris Removal at Bridge Structures | 04/25/21 |
09/01/21 |
|
Inspection and Testing for Asbestos Materials | 05/20/23 |
09/01/23 |
|
Houses and Buildings Demolition (edit.) | 11/14/18 |
06/01/19 |
|
Removal of Existing Traffic Signal Equipment (edit.) | 11/30/06 |
09/01/13 |
|
Borrow Area Wetland Enhancement | 05/20/23 |
09/01/23 |
|
Granular Tire Shreds | 10/19/23 |
03/01/24 |
|
Discovery of Karst Features within the Construction Limits | 10/21/21 |
03/01/22 |
|
Proofrolling Requirements | 08/17/23 |
03/01/24 |
|
Excavation and Embankment | 10/19/23 |
06/01/24 |
|
Excavation and Embankment | 08/15/24 |
03/01/25 |
|
Geotechnical Instrumentation | 05/20/23 |
09/01/23 |
|
Temporary Turbidity Curtain | 02/21/13 |
09/01/13 |
|
Temporary Erosion Control Turbidity Curtain | 02/21/13 |
07/01/13 |
|
Pump Around | 09/16/21 |
03/01/22 |
|
Stormwater Management | 11/17/23 |
06/01/24 |
|
Steel Sheet Piling at Railroad Grade Separation | 05/20/23 |
09/01/23 |
|
Dewatering | 04/25/21 |
09/01/21 |
|
Subgrade Treatment | 10/19/23 |
06/01/24 |
|
Gore Area Treatment | 05/02/19 |
09/01/19 |
|
Geosynthetics | 10/19/23 |
06/01/24 |
|
QC/QA for Soil Fill Sections and QC/QA for Subgrade | 02/18/21 |
09/01/21 |