Language Translation
  Close Menu
INDOT: Division 200 RSPs (2024 SS)

Recurring Special Provisions and Plan Details

Effective for Lettings with the 2024 INDOT Standard Specifications

| RSP Home | Division 100 | Division 200 | Division 300 | Division 400 |

| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |

*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for the correct letting date you need

Division 200 - Earthwork

RSP or RPD
Description
Revision Date*
Letting Date**
Recycled Foundry Sand
05/20/23
09/01/23
Initial Payment for Clearing Right-of-Way
08/18/22
03/01/23
Debris Removal at Bridge Structures
04/25/21
09/01/21
Inspection and Testing for Asbestos Materials
05/20/23
09/01/23
Houses and Buildings Demolition (edit.)
11/14/18
06/01/19
Removal of Existing Traffic Signal Equipment (edit.)
11/30/06
09/01/13
Borrow Area Wetland Enhancement
05/20/23
09/01/23
Granular Tire Shreds
10/19/23
03/01/24
Discovery of Karst Features within the Construction Limits
10/21/21
03/01/22
Proofrolling Requirements
08/17/23
03/01/24
Excavation and Embankment
10/19/23
06/01/24
Excavation and Embankment
08/15/24
03/01/25
Geotechnical Instrumentation
05/20/23
09/01/23
Temporary Turbidity Curtain
02/21/13
09/01/13
Temporary Erosion Control Turbidity Curtain
02/21/13
07/01/13
Pump Around
09/16/21
03/01/22
Stormwater Management
11/17/23
06/01/24
Steel Sheet Piling at Railroad Grade Separation
05/20/23
09/01/23
Dewatering
04/25/21
09/01/21
Subgrade Treatment
10/19/23
06/01/24
Gore Area Treatment
05/02/19
09/01/19
Geosynthetics
10/19/23
06/01/24
QC/QA for Soil Fill Sections and QC/QA for Subgrade
02/18/21
09/01/21

INDOT Events

More News & Events

Top FAQs