Effective for Lettings with the 2024 INDOT Standard Specifications
| RSP Home | Division 100 | Division
200 | Division 300 | Division 400 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for
the correct letting date you need
Division 400 - Asphalt Pavement
RSP or RPD |
Description |
Rev. Date* | Letting Date** |
QC/QA Sampling and Testing on 401 and 410 Pay Items (edit.) | 06/21/18 |
12/01/18 |
|
MSCR Binder Specifications | 10/19/23 |
09/01/24 |
|
MSCR Binder Specifications | 05/17/24 |
12/01/24 |
|
HMA Spray Paver and Emulsion | 05/20/23 |
09/01/23 |
|
Void Reducing Asphalt Membrane for HMA | 05/20/23 |
09/01/23 |
|
SMA Spray Paver and Emulsion | 05/20/23 |
09/01/23 |
|
Void Reducing Asphalt Membrane for SMA | 05/20/23 |
09/01/23 |
|
QC/QA HMA - SMA Pavement | 10/19/23 |
09/01/24 |
|
QC/QA HMA - SMA Pavement | 05/17/24 |
12/01/24 |
|
Cost of Closure Periods for Micro-Surfacing Remedial Work (edit.) | 05/20/23 |
09/01/23 |
|
Warranted Micro-Surfacing | 10/19/23 |
03/01/24 |
|
Cost of Closure Periods for UBWC Remedial Work (edit.) | 05/20/23 |
09/01/23 |
|
Ultrathin Bonded Wearing Course, Warranted | 10/19/23 |
09/01/24 |