Effective for Lettings with the 2024 INDOT Standard Specifications
| RSP Home | Division 100 | Division
200 | Division 300 | Division 400 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
| Division 500 | Division 600 | Division 700 | Division 800 | Division 900 |
*Revision Date = Date the Recurring Special Provision was Added or Revised (mm/dd/yy)
**Letting Date = Effective for use on lettings on or after this date (mm/dd/yy) - Be sure to select the RSP or RPD for
the correct letting date you need
Division 600 - Incidental Construction
RSP or RPD |
Description |
Rev. Date* |
Letting Date** |
Removal of Guardrail | 05/20/23 |
09/01/23 |
|
Hand Dig Guardrail Post Holes Near Utilities | 07/16/20 |
12/01/20 |
|
Polyvinyl Chloride Coated Chain Link Fence | 05/23/13 |
09/01/13 |
|
Curbing | 02/15/24 |
09/01/24 |
|
RCBA Slab Option for Use with Short Term Closures | 05/20/23 |
09/01/23 |
|
Reinforced Concrete Bridge Approaches | 07/20/23 |
12/01/23 |
|
Reinforced Concrete Bridge Approach Details | 04/18/24 |
09/01/24 |
|
Median Crossovers | 05/23/13 |
09/01/13 |
|
Approaches and Crossovers | 02/15/24 |
09/01/24 |
|
High Friction Surface Treatment | 04/25/21 |
09/01/21 |
|
Bridge Painting | 01/18/24 |
06/01/24 |
|
Sound Barrier Systems | 07/20/23 |
12/01/23 |
|
Sound Barrier Systems | 06/15/06 |
09/01/13 |
|
Capping Cut and Fill Slopes Steeper Than 3:1 | 05/23/13 |
09/01/13 |
|
Wildlife Habitat Species and Spacing (edit.) | 05/23/13 |
09/01/13 |
|
Roadside Mowing (edit.) | 05/15/14 |
09/01/14 |
|
Mowing Cycles, Starting Dates, and Failure to Complete Mowing on Time (edit.) | 09/01/05 |
09/01/13 |
|
Herbicide Treatment | 06/08/15 |
09/01/15 |
|
Herbicide Formulation and Application Period (edit.) | 09/01/05 |
09/01/13 |
|
Gabions | 04/25/21 |
09/01/21 |
|
Cable Barrier System (edit.) | 04/25/21 |
09/01/21 |
|
Cable Barrier System Plan Details | 03/21/11 |
09/01/11 |
|
Plant Growth Layer | 05/20/23 |
09/01/23 |