The S.R. 3 Reconstruction Project is an INDOT project involving roadway reconstruction of S.R. 3 (S. Memorial Dr.) from Sherry Lynn Dr. to S.R. 38 (Broad St.) in New Castle. The existing concrete pavement for three northbound lanes, two southbound lanes, and a center turn lane will be replaced with full-depth asphalt pavement to provide two travel lanes in each direction and a center treatment (left-turn lanes or concrete median).
Along S.R. 3, from Trojan Lane to S.R. 38 (Phase 1), a curbed median will be installed. Sidewalks will also be added to both sides of S.R. 3 along this stretch.
From the southern project limits at Sherry Lynn Dr. to Trojan Lane (Phase 2), a two-way left turn lane will be constructed. Sidewalks will be added to the east side of S.R. 3 through this segment.
The project also includes new storm sewers, inlets, and manholes. Some drainage culverts will be replaced or rehabilitated, and pedestrian crosswalk signals and push buttons will be added.
- What is the S.R. 3 Reconstruction Project in New Castle?
- Why is this project needed?
- Why is a raised median being constructed on S.R. 3 between Trojan Ln. and S.R. 38?
- How will this project improve safety?
- How will I navigate the new median configuration? What will I do once left turns have been eliminated at commercial driveways along S.R. 3 from Trojan Lane to S.R. 38?
- How will delivery trucks and semis the new center medians?
- What is the schedule for construction?
- Will road closures occur during construction?
- Who can I contact with questions about this project? How can I stay updated on closures and construction progress?ing