Location: | County | Road | Over | Number | Other Location Information |
---|---|---|---|---|---|
Warrick | New Harmony | Tributary of Pigeon Creek | 87-00140 | 0.53 mile west of Wasson Road |
Statistics: | Owner | Length | Width | Year Built | Type | |
---|---|---|---|---|---|---|
Warrick County | 81’ 0” (3 Spans: 25’, 30’, 25’) | 27’ 6” | 1930 | Continuous Steel Beam | ||
Builder: | Unknown | Status: | Pending - Section 106 historic review process is on-going | |||
Comments: | The first interior pile (from north) of the west interior pier had previously failed by crushing and “mushrooming out,” and that section of pile was removed and replaced in 2021. The east end of the north bridge rail was previously damaged and repaired with a reinforced concrete bridge rail typical section that matches the overall dimensions, but not details, of the remaining bush hammered concrete bridge rail in 2018. |
Contact: | Name | Address | Phone | |
---|---|---|---|---|
Hannah Blad | Hihblad@lochgroup.com | Lochmueller Group, 112 W. Jefferson Blvd., Suite 500, South Bend, IN 46601 | 574.334.5487 |